9 Conditions and Substantial Performance 9 Conditions and Substantial Performance

9.1 Gray v. Gardner 9.1 Gray v. Gardner

17 Mass. 188 (1821)

WILLIAM GRAY
v.
OLIVER GARDNER AND OTHERS.

Supreme Judicial Court of Massachusetts
March Term, 1821.

[188] A promise was to pay a sum of money, on condition that, if a certain quantity of oil should arrive at certain ports, within two fixed days, both inclusive, the promise should be void: in an action upon this promise it was holden that the burden was on the defendants to prove the arrival of the oil; and that to constitute such arrival, the vessel must be moored within the time stipulated.

ASSUMPSIT on a written promise to pay the plaintiff 5198 dollars, 87 cents, with the following condition annexed, viz.,“on the condition that if a greater quantity of sperm oil should arrive in whaling vessels at Nantucket and New Bedford, on or between the first day of April and the first day of October of the present year, both inclusive, than arrived at said places, in whaling vessels, on or within the same term of time the last year, then this obligation to be void.” Dated April 14, 1819.

The consideration of the promise was a quantity of oil, sold by the plaintiff to the defendants. On the same day another note unconditional had been given by the defendants, for the value of the oil, estimated at sixty cents per gallon; and the note in suit was given to secure the residue of the price, estimated at eighty-five cents, to depend on the contingency mentioned in the said condition.

At the trial before the chief justice, the case depended upon the question whether a certain vessel, called the Lady Adams, with a cargo of oil, arrived at Nantucket on the first day of October, 1819, about which fact the evidence was contradictory. The judge ruled that the burden of proving the arrival within the time was on the defendants; and further that, although the vessel might have, within the time, gotten within the space which might be called Nantucket Roads, yet it was necessary that she should have come to anchor, or have been moored, somewhere within that space before the hour of twelve following the first day of October, in order to have arrived, within the meaning of the contract.

The opinion of the chief justice on both these points was objected to by the defendants, and the questions were saved. If it was wrong on either point, a new trial was to be had; otherwise judgment was to be rendered on the verdict, which was found for the plaintiff.

[189] Whitman, for the defendants. As the evidence at the trial was contradictory, the question on whom the burden of proof rested, became important. We hold that it was on the plaintiff. This was a condition precedent. Until it should happen, the promise did not take effect. On the occurrence of a certain contingent event, the promise was to be binding, and not otherwise. To entitle himself to enforce the promise, the plaintiff must show that the contingent event has actually occurred.

On the other point saved at the trial, the defendants insist that it was not required by the terms of this contract that the vessel should be moored. It is not denied that such would be the construction of a policy of insurance containing the same expression. But every contract is to be taken according to the intention of the parties to it, if such intention be legal, and capable of execution. The contemplation of parties to a policy of insurance is, that the vessel shall be safe before she shall be said to have arrived. So it is in some other maritime contracts. But in that now in question, nothing was in the minds of the parties, but that the fact of the arrival of so much oil should be known within the time limited. The subject matter in one case is safety, in the other it is information only. In this case the vessel would be said to have arrived, in common understanding, and according to the meaning of the parties[1].

F. C. Gray, for the plaintiff.

PARKER, C. J.

The very words of the contract show that there was a promise to pay, which was to be defeated by the happening of an event, viz., the arrival of a certain quantity of oil, at the specified places, in a given time. It is like a bond with a condition; if the obligor would avoid the bond, he must show performance of the condition. The defendants, in this case, promise to pay a certain sum of money, on condition that the promise shall be void on the happening of an event. It is plain that the burden of proof is upon them; and if they fail to show that the event has happened, the promise remains good.

The other point is equally clear for the plaintiff. Oil [190] is to arrive at a given place before twelve o'clock at night. A vessel with oil heaves in sight, but she does not come to anchor before the hour is gone. In no sense can the oil be said to have arrived. The vessel is coming until she drops anchor, or is moored. She may sink, or take fire, and never arrive, however near she may be to her port. It is so in contracts of insurance; and the same reason applies to a case of this sort. Both parties put themselves upon a nice point in this contract; it was a kind of wager as to the quantity of oil which should arrive at the ports mentioned, before a certain period. They must be held strictly to their contract, there being no equity to interfere with the terms of it.

Judgment on the verdict.

[1] Vide 6 Mass. Rep. 313, Bill & Al. vs. Mason.

9.2 Howard v. Federal Crop Insurance 9.2 Howard v. Federal Crop Insurance

540 F.2d 695 (1976)

Larry K. HOWARD et al., Appellants,
v.
FEDERAL CROP INSURANCE CORPORATION, Appellee.

No. 75-1184.

United States Court of Appeals, Fourth Circuit.

Argued June 13, 1975.
Decided June 28, 1976.

Edgar R. Bain, Lellington, N. C., and Holt Felmet, Angier, N. C., for appellants.

Jack Crawley, Asst. U. S. Atty., Raleigh, N. C. (Thomas P. McNamara, U. S. Atty., and Joseph W. Dean, Asst. U. S. Atty., Raleigh, N. C., on brief), for appellee.

Before RUSSELL, FIELD and WIDENER, Circuit Judges.

WIDENER, Circuit Judge:

Plaintiff-appellants sued to recover for losses to their 1973 tobacco crop due to alleged rain damage. The crops were insured by defendant-appellee, Federal Crop [696] Insurance Corporation (FCIC). Suits were brought in a state court in North Carolina and removed to the United States District Court. The three suits are not distinguishable factually so far as we are concerned here and involve identical questions of law. They were combined for disposition in the district court and for appeal. The district court granted summary judgment for the defendant and dismissed all three actions. We remand for further proceedings. Since we find for the plaintiffs as to the construction of the policy, we express no opinion on the procedural questions.

Federal Crop Insurance Corporation, an agency of the United States, in 1973, issued three policies to the Howards, insuring their tobacco crops, to be grown on six farms, against weather damage and other hazards.

The Howards (plaintiffs) established production of tobacco on their acreage, and have alleged that their 1973 crop was extensively damaged by heavy rains, resulting in a gross loss to the three plaintiffs in excess of $35,000. The plaintiffs harvested and sold the depleted crop and timely filed notice and proof of loss with FCIC, but, prior to inspection by the adjuster for FCIC, the Howards had either plowed or disked under the tobacco fields in question to prepare the same for sowing a cover crop of rye to preserve the soil. When the FCIC adjuster later inspected the fields, he found the stalks had been largely obscured or obliterated by plowing or disking and denied the claims, apparently on the ground that the plaintiffs had violated a portion of the policy which provides that the stalks on any acreage with respect to which a loss is claimed shall not be destroyed until the corporation makes an inspection.

The holding of the district court is best capsuled in its own words:

"The inquiry here is whether compliance by the insureds with this provision of the policy was a condition precedent to the recovery. The court concludes that it was and that the failure of the insureds to comply worked a forfeiture of benefits for the alleged loss."[1]

There is no question but that apparently after notice of loss was given to defendant, but before inspection by the adjuster, plaintiffs plowed under the tobacco stalks and sowed some of the land with a cover crop, rye. The question is whether, under paragraph 5(f) of the tobacco endorsement to the policy of insurance, the act of plowing under the tobacco stalks forfeits the coverage of the policy. Paragraph 5 of the tobacco endorsement is entitled Claims. Pertinent to this case are subparagraphs 5(b) and 5(f), which are as follows:

"5(b) It shall be a condition precedent to the payment of any loss that the insured establish the production of the insured crop on a unit and that such loss has been directly caused by one or more of the hazards insured against during the insurance period for the crop year for which the loss is claimed, and furnish any other information regarding the manner and extent of loss as may be required by the Corporation. (Emphasis added)"
"5(f) The tobacco stalks on any acreage of tobacco of types 11a, 11b, 12, 13, or 14 with respect to which a loss is claimed shall not be destroyed until the Corporation makes an inspection. (Emphasis added)"

The arguments of both parties are predicated upon the same two assumptions. First, if subparagraph 5(f) creates a condition precedent, its violation caused a forfeiture of plaintiffs' coverage. Second, if subparagraph 5(f) creates an obligation (variously called a promise or covenant) upon plaintiffs not to plow under the tobacco stalks, defendant may recover from plaintiffs (either in an original action, or, in this case, by a counterclaim, or as a matter of defense) for whatever damage it sustained [697] because of the elimination of the stalks. However, a violation of subparagraph 5(f) would not, under the second premise, standing alone, cause a forfeiture of the policy.

Generally accepted law provides us with guidelines here. There is a general legal policy opposed to forfeitures. United States v. One Ford Coach, 307 U.S. 219, 226, 59 S.Ct. 861, 83 L.Ed. 1249 (1939); Baca v. Commissioner of Internal Revenue, 326 F.2d 189, 191 (5th Cir. 1963). Insurance policies are generally construed most strongly against the insurer. Henderson v. Hartford Accident & Indemnity Co., 268 N.C. 129, 150 S.E.2d 17, 19 (1966). When it is doubtful whether words create a promise or a condition precedent, they will be construed as creating a promise. Harris and Harris Const. Co. v. Crain and Denbo, Inc., 256 N.C. 110, 123 S.E.2d 590, 595 (1962). The provisions of a contract will not be construed as conditions precedent in the absence of language plainly requiring such construction. Harris, 123 S.E.2d at 596. And Harris, at 123 S.E.2d 590, 595, cites Jones v. Palace Realty Co., 226 N.C. 303, 37 S.E.2d 906 (1946), and Restatement of the Law, Contracts, § 261.

Plaintiffs rely most strongly upon the fact that the term "condition precedent" is included in subparagraph 5(b) but not in subparagraph 5(f). It is true that whether a contract provision is construed as a condition or an obligation does not depend entirely upon whether the word "condition" is expressly used. Appleman, Insurance Law and Practice (1972), vol. 6A, § 4144. However, the persuasive force of plaintiffs' argument in this case is found in the use of the term "condition precedent" in subparagraph 5(b) but not in subparagraph 5(f). Thus, it is argued that the ancient maxim to be applied is that the expression of one thing is the exclusion of another.

The defendant places principal reliance upon the decision of this court in Fidelity-Phenix Fire Insurance Company v. Pilot Freight Carriers, 193 F.2d 812, 31 A.L.R.2d 839 (4th Cir. 1952). Suit there was predicated upon a loss resulting from theft out of a truck covered by defendant's policy protecting plaintiff from such a loss. The insurance company defended upon the grounds that the plaintiff had left the truck unattended without the alarm system being on. The policy contained six paragraphs limiting coverage. Two of those imposed what was called a "condition precedent." They largely related to the installation of specified safety equipment. Several others, including paragraph 5, pertinent in that case, started with the phrase, "It is further warranted." In paragraph 5, the insured warranted that the alarm system would be on whenever the vehicle was left unattended. Paragraph 6 starts with the language: "The assured agrees, by acceptance of this policy, that the foregoing conditions precedent relate to matters material to the acceptance of the risk by the insurer." Plaintiff recovered in the district court, but judgment on its behalf was reversed because of a breach of warranty of paragraph 5, the truck had been left unattended with the alarm off. In that case, plaintiff relied upon the fact that the words "condition precedent" were used in some of the paragraphs but the word "warranted" was used in the paragraph in issue. In rejecting that contention, this court said that "warranty" and "condition precedent" are often used interchangeably to create a condition of the insured's promise, and "[m]anifestly the terms `condition precedent' and `warranty' were intended to have the same meaning and effect." 193 F.2d at 816.

Fidelity-Phenix thus does not support defendant's contention here. Although there is some resemblance between the two cases, analysis shows that the issues are actually entirely different. Unlike the case at bar, each paragraph in Fidelity-Phenix contained either the term "condition precedent" or the term "warranted." We held that, in that situation, the two terms had the same effect in that they both involved forfeiture. That is well established law. See Appleman, Insurance Law and Practice (1972), vol. 6A, § 4144. In the case at bar, the term "warranty" or "warranted" is in no way involved, either in terms or by way of like language, as it was in Fidelity-Phenix. The issue upon which this case [698] turns, then, was not involved in Fidelity-Phenix.

The Restatement of the Law of Contracts states:

"§ 261. INTERPRETATION OF DOUBTFUL WORDS AS PROMISE OR CONDITION.
Where it is doubtful whether words create a promise or an express condition, they are interpreted as creating a promise; but the same words may sometimes mean that one party promises a performance and that the other party's promise is conditional on that performance."

Two illustrations (one involving a promise, the other a condition) are used in the Restatement:

"2. A, an insurance company, issues to B a policy of insurance containing promises by A that are in terms conditional on the happening of certain events. The policy contains this clause: `provided, in case differences shall arise touching any loss, the matter shall be submitted to impartial arbitrators, whose award shall be binding on the parties.' This is a promise to arbitrate and does not make an award a condition precedent of the insurer's duty to pay.
3. A, an insurance company, issues to B an insurance policy in usual form containing this clause: `In the event of disagreement as to the amount of loss it shall be ascertained by two appraisers and an umpire. The loss shall not be payable until 60 days after the award of the appraisers when such an appraisal is required.' This provision is not merely a promise to arbitrate differences but makes an award a condition of the insurer's duty to pay in case of disagreement." (Emphasis added)

We believe that subparagraph 5(f) in the policy here under consideration fits illustration 2 rather than illustration 3. Illustration 2 specifies something to be done, whereas subparagraph 5(f) specifies something not to be done. Unlike illustration 3, subparagraph 5(f) does not state any conditions under which the insurance shall "not be payable," or use any words of like import. We hold that the district court erroneously held, on the motion for summary judgment, that subparagraph 5(f) established a condition precedent to plaintiffs' recovery which forfeited the coverage.[2]

From our holding that defendant's motion for summary judgment was improperly allowed, it does not follow the plaintiffs' motion for summary judgment should have been granted, for if subparagraph 5(f) be not construed as a condition precedent, there are other questions of fact to be determined.[3] At this point, we merely hold that the district court erred in holding, on the motion for summary judgment, that subparagraph 5(f) constituted a condition precedent with resulting forfeiture.

The explanation defendant makes for including subparagraph 5(f) in the tobacco endorsement is that it is necessary that the stalks remain standing in order for the Corporation to evaluate the extent of loss and [699] to determine whether loss resulted from some cause not covered by the policy. However, was subparagraph 5(f) inserted because without it the Corporation's opportunities for proof would be more difficult, or because they would be impossible? Plaintiffs point out that the Tobacco Endorsement, with subparagraph 5(f), was adopted in 1970, and crop insurance goes back long before that date. Nothing is shown as to the Corporation's prior 1970 practice of evaluating losses. Such a showing might have a bearing upon establishing defendant's intention in including 5(f). Plaintiffs state, and defendant does not deny, that another division of the Department of Agriculture, or the North Carolina Department, urged that tobacco stalks be cut as soon as possible after harvesting as a means of pest control. Such an explanation might refute the idea that plaintiffs plowed under the stalks for any fraudulent purpose. Could these conflicting directives affect the reasonableness of plaintiffs' interpretation of defendant's prohibition upon plowing under the stalks prior to adjustment?

We express no opinion on these questions because they were not before the district court and are mentioned to us largely by way of argument rather than from the record. No question of ambiguity was raised in the court below or here and no question of the applicability of paragraph 5(c) to this case was alluded to other than in the defendant's pleadings, so we also do not reach those questions. Nothing we say here should preclude FCIC from asserting as a defense that the plowing or disking under of the stalks caused damage to FCIC if, for example, the amount of the loss was thereby made more difficult or impossible to ascertain whether the plowing or disking under was done with bad purpose or innocently. To repeat, our narrow holding is that merely plowing or disking under the stalks does not of itself operate to forfeit coverage under the policy.

The case is remanded for further proceedings not inconsistent with this opinion.

VACATED AND REMANDED.

[1] The district court also relied upon language in subparagraph 5(b), infra, which required as a condition precedent to payment that the insured, in addition to establishing his production and loss from an insured case, "furnish any other information regarding the manner and extent of loss as may be required by the Corporation." The court construed the preservation of the stalks as such "information." We see no language in the policy or connection in the record to indicate this is the case.

[2] The district court also referred to subparagraph 5(f) as a condition subsequent. The difference in terminology is of no consequence here.

[3] Even apart from our interpretation of paragraph 5(f), plaintiffs' motion for summary judgment should not have been allowed. Plaintiffs' notice is predicated upon the assumption that defendant's entire defense was based upon its interpretation of paragraph 5(f). Actually, defendant denied paragraph VII of plaintiffs' complaint, which constituted a denial that plaintiffs suffered loss in the amount claimed; also it alluded to paragraph 5(c) which under certain circumstances may require a total production figure equal to the insurance provided. Plaintiffs' affidavit, which was not denied by a counteraffidavit, does state the amount of loss. Said affidavit does not, however, state facts sufficient to absolutely establish that said loss occurred as a result of a risk covered by the policy or to exclude all other possible defenses. Plaintiffs' assumption that liability was denied solely because of their acts of plowing under the tobacco stalks is apparently based upon the discovery deposition of adjuster Burr. Such a conclusion does not conclusively appear from Burr's deposition. But, even if it does so appear, the defendant would not be bound absolutely by Burr's testimony. Although Burr was an agent of the Corporation, his admission would be no more than evidence and not necessarily conclusive.

9.3 Parsons v. Bristol Development Co. 9.3 Parsons v. Bristol Development Co.

62 Cal.2d 861 (1965)

CEJAY PARSONS, Plaintiff and Appellant,
v.
BRISTOL DEVELOPMENT COMPANY et al., Defendants and Respondents.

L. A. No. 27434.

Supreme Court of California. In Bank.

June 17, 1965.

Floyd H. Norris as Amicus Curiae on behalf of Plaintiff and Appellant.

Felix H. McGinnis for Plaintiff and Appellant.

Launer, Chaffee & Hanna, Daniel L. Stack, Miller, Nisson, Kogler & Wenke and Clark Miller for Defendants and Respondents.

C. Douglas Wikle, Walter Atkinson, W. Alan Thody, Dell L. Falls, Cooper & Boller, Rowland, Paras & Clowdus and Gloyd T. Clowdus as Amici Curiae on behalf of Defendants and Respondents.

TRAYNOR, C. J.

In December 1960 defendant Bristol Development Company entered into a written contract with plaintiff engaging him as an architect to design an office building for a lot in Santa Ana and to assist in supervising construction.plaintiff's services were to be performed in two phases. He completed phase one, drafting preliminary plans and specifications, on January 20, 1961, and Bristol paid him $600.

The dispute concerns Bristol's obligation to pay plaintiff under phase two of the contract. The contract provided that "a condition precedent to any duty or obligation on the part [864] of the Owner [Bristol] to commence, continue or complete Phase 2 or to pay Architect any fee therefor, shall be the obtaining of economically satisfactory financing arrangements which will enable Owner, in its sole judgment, to construct the project at a cost which in the absolute decision of the Owner shall be economically feasible." It further provided that when Bristol notified plaintiff to proceed with phase two it should pay him an estimated 25 per cent of his fee, and that it would be obligated to pay the remaining 75 per cent "only from construction loan funds."

Using plaintiff's preliminary plans and specifications, Bristol obtained from a contractor an estimate of $1,020,850 as the cost of construction, including the architect's fee of 6 per cent. On the basis of this estimate, it received an offer from a savings and loan company for a construction loan upon condition that it show clear title to the Santa Ana lot and execute a first trust deed in favor of the loan company.

Shortly after obtaining this offer from the loan company, Bristol wrote plaintiff on March 14, 1961, to proceed under phase two of the contract. In accordance with the contract, Bristol paid plaintiff $12,000, an estimated 25 per cent of his total fee. Thereafter, plaintiff began to draft final plans and specifications for the building.

Bristol, however, was compelled to abandon the project because it was unable to show clear title to the Santa Ana lot and thus meet the requirements for obtaining a construction loan. Bristol's title became subject to dispute on May 23, 1961, when defendant James Freeman filed an action against Bristol claiming an adverse title. [684] On August 15, 1961, Bristol notified plaintiff to stop work on the project.

Plaintiff brought an action against Bristol and Freeman to recover for services performed under the contract and to foreclose a mechanic's lien on the Santa Ana lot. The trial court, sitting without a jury, found that Bristol's obligation to make further payment under the contract was conditioned upon the existence of construction loan funds. On the ground that this condition to plaintiff's right to further payment was not satisfied, the court entered judgment for defendants.plaintiff appeals.

The trial court properly admitted evidence extrinsic to the written instrument to determine the circumstances under [865] which the parties contracted and the purpose of the contract. (Code Civ. Proc., 1860; Civ. Code, 1647; see Corbin, The Interpretation of Words and the Parol Evidence Rule, 50 Cornell L.Q. 161.) There is no conflict in that evidence. Bristol contends, however, that an appellate court is compelled to accept any reasonable interpretation of a written instrument adopted by a trial court whether or not extrinsic evidence has been introduced to interpret the instrument and whether or not that evidence, if any, is in conflict. We do not agree with this contention.

Since there has been confusion concerning the rules for appellate review of the interpretation of written instruments (see Estate of Platt, 21 Cal.2d 343, 352 [131 P.2d 825] [concurring opinion]; Estate of Shannon, 231 Cal.App.2d 886, 889-890 [42 Cal.Rptr. 278]), it is appropriate here to define the scope of such review.

[1] The interpretation of a written instrument, even though it involves what might properly be called questions of fact (see Thayer, Preliminary Treatise on Evidence, pp. 202-204), is essentially a judicial function to be exercised according to the generally accepted canons of interpretation so that the purposes of the instrument may be given effect. (See Civ. Code, 1635-1661; Code Civ. Proc., 1856-1866.) [2] Extrinsic evidence is "admissible to interpret the instrument, but not to give it a meaning to which it is not reasonably susceptible" (Coast Bank v. Minderhout, 61 Cal.2d 311, 315 [38 Cal.Rptr. 505, 392 P.2d 265]; Nofziger v. Holman, 61 Cal.2d 526, 528 [39 Cal.Rptr. 384, 393 P.2d 696]; Imbach v. Schultz, 58 Cal.2d 858, 860 [27 Cal.Rptr. 160, 377 P.2d 272]), and it is the instrument itself that must be given effect. (Civ. Code, 1638, 1639; Code Civ. Proc., 1856.) [3] It is therefore solely a judicial function to interpret a written instrument unless the interpretation turns upon the credibility of extrinsic evidence. [4] Accordingly, "An appellate court is not bound by a construction of the contract based solely upon the terms of the written instrument without the aid of evidence [citations], where there is no conflict in the evidence [citations], or a determination has been made upon incompetent evidence [citation]." (Estate of Platt, 21 Cal.2d 343, 352 [131 P.2d 825]. Accord, Moore v. Wood, 26 Cal.2d 621, 629-630 [160 P.2d 772]; Western Coal & Mining Co. v. Jones, 27 Cal.2d 819, 826-827 [167 P.2d 719, 164 A.L.R. 685]; Estate of [866] Wunderle, 30 Cal.2d 274, 280 [181 P.2d 874]; Estate of Fleming, 31 Cal.2d 514, 523 [190 P.2d 611]; Meyer v. State Board of Equalization, 42 Cal.2d 376, 381 [267 P.2d 257].) [685]

[5] It is true that cases have said that even in the absence of extrinsic evidence the trial court's interpretation of a written instrument must be accepted "if such interpretation is reasonable, or if [it] is one of two or more reasonable constructions of the instrument" (Prickett v. Royal Ins. Co., 56 Cal.2d 234, 237 [14 Cal.Rptr. 675, 363 P.2d 907, 86 A.L.R.2d 711]; Lundin v. Hallmark Productions, Inc. 161 Cal.App.2d 698, 701 [327 P.2d 166]), or if it is "equally tenable" with the appellate court's interpretation (Estate of Northcutt, 16 Cal.2d 683, 690 [107 P.2d 607]; accord, Estate of Cuneo, 60 Cal.2d 196, 201 [32 Cal.Rptr. 409, 384 P.2d 1]). Such statements are not in conflict with Estate of Platt, supra, 21 Cal.2d 343, if they are interpreted, as they should be, to mean only that an appellate court must determine that the trial court's interpretation is erroneous before it may properly reverse a judgment. (See Estate of Shannon, 231 Cal.App.2d 886, 893 [42 Cal.Rptr. 278].) They do not mean that the appellate court is absolved of its duty to interpret the instrument.

Since there is no conflict in the extrinsic evidence in the present case we must make an independent determination of the meaning of the contract. After providing for payment of an estimated 25 per cent of plaintiff's fee upon written notice to proceed with phase two, paragraph 4 of the contract makes the following provisions for payment: [867]

"4. ..."

"(a) ..."

"(b) Upon completion of final working plans, specifications and engineering, or authorized commencement of construction, whichever is later, a sum equal to Seventy-Five (75%) Per Cent of the fee for services in Phase 2, less all previous payments made on account of fee; provided, however, that this payment shall be made only from construction loan funds."

"(c) The balance of the fee shall be paid in equal monthly payments commencing with the first day of the month following payments as set forth in Paragraph 4(b); provided, however, that Ten (10%) Per Cent of the fee based upon the reasonable estimated cost of construction shall be withheld until thirty (30) days after the Notice of Completion of the project has been filed."

"(d) If any work designed or specified by the Architect is abandoned of [sic] suspended in whole or in part, the Architect is to be paid forthwith to the extent that his services have been rendered under the preceding terms of this paragraph. Should such abandonment or suspension occur before the Architect has completed any particular phase of the work which entitles him to a partial payment as aforesaid, the Architect's fee shall be prorated based upon the percentage of the work completed under that particular phase and shall be payable forthwith."

[6] Invoking the provision that "payment shall be made only from construction loan funds," Bristol contends that since such funds were not obtained it is obligated to pay plaintiff no more than he has already received under the contract.

Plaintiff, on the other hand, contends that he performed 95 per cent of his work on phase two and is entitled to that portion of his fee under subdivision (d) of paragraph 4 less the previous payment he received. He contends that subdivision (d) is a "savings clause" designed to secure partial payment if, for any reason, including the lack of funds, the project was abandoned or suspended.plaintiff would limit the construction loan condition to subdivision (b), for it provides "that this payment shall be made only from construction loan funds" (emphasis added), whereas the other subdivisions are not expressly so conditioned.

The construction loan condition, however, cannot reasonably be limited to subdivision (b), for subdivisions (c) and [868] (d) both refer to the terms of subdivision (b) and must therefore be interpreted with reference to those terms. Thus, the "balance of the fee" payable "in equal monthly payments" under subdivision (c) necessarily refers to the preceding subdivisions of paragraph 4. [686] In the absence of evidence to the contrary, subdivision (d), upon which plaintiff relies, must likewise be interpreted to incorporate the construction loan condition (Civ. Code, 1641), for it makes explicit reference to payment under preceding subdivisions by language such as "under the preceding terms" and "partial payment as aforesaid." Subdivision (d) merely provides for accelerated payment upon the happening of a contingency. It contemplates, however, that construction shall have begun, for it provides for prorated payment upon the abandonment or suspension in whole or in part of "any work designed or specified by the Architect." Implicit in the scheme is the purpose to provide, after initial payments, for a series of payments from construction loan funds, with accelerated payment from such funds in the event that construction was abandoned or suspended. Although plaintiff was guaranteed an estimated 25 per cent of his fee if the project was frustrated before construction, further payment was contemplated only upon the commencement of construction. This interpretation is supported by evidence that plaintiff knew that Bristol's ability to undertake construction turned upon the availability of loan funds. Accordingly, the trial court properly determined that payments beyond an estimated 25 per cent of plaintiff's fee for phase two were to be made only from construction loan funds.

[7] When "payment of money is to be made from a specific fund, and not otherwise, the failure of such fund will defeat the right of recovery." (Rains v. Arnett, 189 Cal.App.2d 337, 347 [11 Cal.Rptr. 299].) Although there are exceptions to this rule, plaintiff has neither alleged nor proved facts that entitle him to recover on the ground of any exception.

[8] Each party to a contract has a duty to do what the contract presupposes he will do to accomplish its purpose. (Bewick v. Mecham, 26 Cal.2d 92, 99 [156 P.2d 757, 157 A.L.R. 1277].) [9] Thus, "A party who prevents fulfillment of a condition of his own obligation ... cannot rely [869] on such condition to defeat his liability." (Bewick v. Mecham, supra, 26 Cal.2d at p. 99; Pacific Venture Corp. v. Huey, 15 Cal.2d 711, 717 [104 P.2d 641].)plaintiff, however, has not shown that Bristol failed to make the proper and reasonable efforts that were contemplated to secure the loan from which he was to be paid. (Cf. Rosenheim v. Howze, 179 Cal. 309 [176 P. 456].) The risk that a loan might not be obtained even though Bristol acted properly and in good faith was a risk clearly anticipated even though the reason the loan failed may not have been foreseen.

[10] Nor has plaintiff established grounds for applying the doctrine of equitable estoppel to deny Bristol the right to invoke the construction loan condition. (See Code Civ. Proc., 1962, subd. 3.) If, by its letter of March 14, asking plaintiff to proceed with his work under phase two of the contract, Bristol had induced plaintiff to believe that funds had been obtained, and if plaintiff had reasonably relied upon such representation, Bristol could not invoke the condition to defeat its contractual liability. Reasonable reliance resulting in a foreseeable prejudicial change in position is the essence of equitable estoppel, and therefore a compelling basis for preventing a party from invoking a condition that he represented as being satisfied. (See Crestline Mobile Homes Mfg. Co. v. Pacific Finance Corp., 54 Cal.2d 773, 778-781 [8 Cal.Rptr. 448, 356 P.2d 192]; cf. Drennan v. Star Paving Co., 51 Cal.2d 409, 414-415 [333 P.2d 757].) Bristol, however, did not represent that funds had been obtained, and plaintiff did not reasonably rely upon the existence of construction loan funds when he undertook work under phase two of the contract. A representative of Bristol told plaintiff before he began phase two of his work that although Bristol would be able to pay plaintiff $12,000, an estimated 25 per cent of his fee, "they would not be able to proceed unless actual construction funds were obtained."plaintiff, knowing that funds had not been obtained, nevertheless chose to proceed with his work on the project.

[11] Finally, plaintiff has not shown that Bristol breached the duty to give him notice when it became clear that construction funds could not be obtained. Without such funds the purpose of the contract would have been frustrated and plaintiff could not have been paid the balance of his fee.plaintiff therefore would have been excused from performing so long as there was a reasonable doubt as to his compensation. Whether or not such funds were obtained was a matter [870] peculiarly within Bristol's knowledge. Accordingly, Bristol had a duty to notify plaintiff that the project was imperiled when Freeman filed his action against Bristol on May 23, for Bristol then knew or should have known that it would be unable to obtain a loan.plaintiff, however, has not shown that he failed to receive such notice, and even if it is assumed that he had no notice, he did not prove the extent to which he suffered damages by continuing to work after he should have received notice.

The judgment is affirmed.

McComb, J., Peters, J., Tobriner, J., Peek, J., Mosk, J., and Burke, J., concurred.

[684] 1. Freeman had previously conveyed the Santa Ana lot to Bristol on October 1, 1960, with the understanding that Bristol would construct an office building upon the lot and pay Freeman an annuity.

[685] 2. We disapprove language in Estate of Rule, 25 Cal.2d 1, 11 [152 P.2d 1003, 155 A.L.R. 1319], to the effect that an appellate court must accept a trial court's interpretation of a written instrument when "conflicting inferences may be drawn" from extrinsic evidence. The rule of Estate of Platt, 21 Cal.2d 343, 352 [131 P.2d 825], and the cases applying it make it clear that it is only when conflicting inferences arise from conflicting evidence, not from uncontroverted evidence, that the trial court's resolution is binding. "The very possibility of ... conflicting inferences, actually conflicting interpretations, far from relieving the appellate court of the responsibility of interpretation, signalizes the necessity of its assuming that responsibility." (Estate of Rule, supra, 25 Cal.2d at p. 17 [dissenting opinion].) Language in E. K. Wood Lumber Co. v. Higgins, 54 Cal.2d 91, 94 [4 Cal.Rptr. 523, 351 P.2d 795]; Faus v. Pacific Electric Ry. Co., 146 Cal.App.2d 370, 375 [303 P.2d 814]; Overton v. Vita-Food Corp., 94 Cal.App.2d 367, 370 [210 P.2d 757], invoking Estate of Rule, is likewise disapproved. A similar statement concerning conflicting inferences from uncontroverted evidence in Estate of Jones, 55 Cal.2d 531, 538 [11 Cal.Rptr. 574, 360 P.2d 70], is also disapproved. The cases cited in support of such a rule by the Jones case did not involve the interpretation of written instruments.

[686] 3. Although neither the amount of each monthly payment nor the number of payments was specified, the amount and number could be determined from the time estimated to construct the building.

9.4 Nichols v. Raynbred 9.4 Nichols v. Raynbred

 NICHOLS
AND
RAYNBRED.

Hill. 12 Jac. Rot. 131.
[K.B. 1615]

Assumpsit.

Suff. Jenk. Cent. 296. 4 Co. 94. 17.38. Ben. 150. Dy.30.a. Yelv. 134. 4 Leo. 3. 3 Cro. 543. Promise for promise. Post. 106.

Nichols brought an assumpsit against Raynbred, declaring that in consideration, that Nichols promised to deliver the defendant to his own use a cow, the defendant promised to deliver him 50 shillings: adjudged for the plaintiff in both Courts, that the plaintiff need not to aver the delivery of the cow, because it is promise for promise. Note here the promises must be at one instant, for else they will be both nuda pacta.

9.5 Kingston v. Preston 9.5 Kingston v. Preston

Kingston
v.
Preston

E. 13 Geo. 3.
Court of King's Bench, 1773.

"It was an action of debt, for non-performance of covenants contained in certain articles of agreement between the plaintiff and the defendant. The declaration stated;—That, by articles made the 24th of March, 1770, the plaintiff, for the considerations therein-after mentioned, covenanted, with the defendant, to serve him for one year and a quarter next ensuing, as a covenant-servant, in his trade of a silk-mercer, at £200 a year, and in consideration of the premises, the defendant covenanted, that at the end of the year and a quarter, he would give up his business of a mercer to the plaintiff, and a nephew of the defendant, or some other person to be nominated. by the defendant, and give up to them his stock in trade, at a fair valuation ; and that, between the young traders, deeds of partnership should be executed for 14 years, and from and immediately after the execution of, the said deeds, the defendant would permit the said young traders to carry on the said business in the [2 Douglas 690] defendant's house.—Then the declaration stated a covenant by the plaintiff, that he would accept the business and stock in trade, at a fair valuation, with the defendant's nephew, or such other person, &c. and execute such deeds of partnership, and, further, that the plaintiff should, and would, at, and before, the sealing and delivery of the deeds, cause and procure good and sufficient security to be given to the defendant, to be approved of by the defendant, for the payment of £250 monthly, to the defendant, in lieu of a moiety of the monthly produce of the stock in trade, until the value of the stock should be reduced to £4000.—Then the plaintiff averred, that he had performed, and been ready to perform, his covenants, and assigned for breach on the part of the defendant, that he had refused to surrender and give up his business, at the end of the said year and a quarter.—The defendant pleaded, 1. That the plaintiff did not offer sufficient security; and, 2. That he did not give sufficient security for the payment of the £250, &c.—And the plaintiff demurred generally to both pleas.—On the part of the plaintiff, the case was argued by Mr. Buller, who contended, that the covenants were mutual and independant, and, therefore, a plea of the breach of one of the covenants to be performed by the plaintiff was no bar to an action for a breach by the defendant of one of which he had bound himself to perform, but that the defendant might have his remedy for the breach by the plaintiff, in a separate action. On the other side, Mr. Grose insisted, that the covenants were dependant in their nature, and, therefore, performance must be alleged: the security to be given for the money, was manifestly the chief object of the transaction, and it would be highly unreasonable to construe the agreement, so as to oblige the defendant to give up a beneficial business, and valuable stock in trade, and trust to the plaintiff's personal security, (who might, and, indeed, was admitted to be worth nothing,) for the performance of his part.

In delivering the judgment of the Court, Lord Mansfield expressed himself to the following effect: There are three kinds of covenants: 1. Such as are called mutual and independant, where either party may recover damages from the other, for the injury he may have received by a breach of the covenants in his favour, and where it is no excuse for the defendant, to allege a breach of the covenants on the part of the plaintiff. 2. There are covenants which are conditions and dependant, in which the [2 Douglas 691] performance of one depends on the prior performance of another, and, therefore, till this prior condition is performed, the other party is not liable to an action on his covenant[1]. 3. There is also [99 Eng. Rep. 438] a third sort of covenants, which are mutual conditions to be performed at the same time; and, in these, if one party was ready, and offered, to perform his part, and the other neglected, or refused, to perform his, he who was ready, and offered, has fulfilled his engagement, and may maintain an action for the default of the other; though it is not certain that either is obliged to do the first act.—His Lordship then proceeded to say, that the dependance, or independance, of covenants, was to be collected from the evident sense and meaning of the parties[3], and, that, however transposed they might be in the deed, their precedency must depend on the order of time in which the intent of the transaction requires their performance. That, in the case before the Court, it would be the greatest injustice if the plaintiff should prevail: the essence of the agreement was, that the defendant should not trust to the personal security of the plaintiff, but, before he delivered up his stock and business, should have good security for the payment of the money. The giving such security, therefore, must necessarily be a condition precedent.—Judgment was accordingly given for the defendant, because the part to be performed by the plaintiff was clearly a condition precedent."

[1] Vide Duke of St. Alban's v. Shore, C. B. T. 29 Geo. 3, H. Bl. 270, 279, 280, where a rule laid down in Boone v. Eyre, viz. that where a covenant goes to the whole of the consideration on both sides, it is a condition precedent, was adopted and confirmed[2].

[2] See Glazebrook v. Woodrow, 8 T. R. 366, acc.: where this case of Kingston v. Preston, is referred to by Grose and Le Blanc, Justices, as a leading authority on the construction of covenants as dependant or independant. The converse of this proposition was also maintained in Campbell v. Jones, 6 T. R. 570, where the covenant sued upon was to pay £500, and the covenant which the defendant relied upon was a covenant that be, the plaintiff, would instruct the defendant in bleaching, and permit him to bleach in the same manner, during the continuance of his (plaintiff's) patent.—Defendant demurred to the declaration, because it did not state that plaintiff had so instructed him; but the Court thought it not a condition precedent.

[3] Acc. per Cur. in Hotham v. E. India Company, 1 T. R. 638. It was there held that a ship owner might recover in covenant against the freighters for short tonnage, notwithstanding a covenant that no such claim should be allowed, unless it should be found upon a survey taken at the end of the voyage, by persons appointed between the parties; of which last covenant no mention was made in the declaration: the Court, considering it in the nature of a defeasance, or condition subsequent, to be shewn by the defendants as matter of defence, if they meant to rely on it. See also Morton v. Lamb, 7 T. R. 125, as to the necessity of averring readiness at least in the declaration, to do the plaintiff's part, (where something is to be done by both parties to a contract at the same time), in order to entitle him to recover against the defendant for not performing his part. But this need not amount to an actual tender to do an act, which the party was not bound to perform, to entitle him to claim performance from the other party. Rawson v. Johnson, 1 East, 203, where the action was for nondelivery of malt at a certain price, on request; and it was held, that an averment that the plaintiff made the request, and was ready and willing to receive and pay for the malt, but that the defendant refused to deliver it, was sufficient, without stating an actual tender of the money.

9.6 Conley v. Pitney Bowes 9.6 Conley v. Pitney Bowes

34 F.3d 714 (1994)

Donald E. CONLEY, Appellant,
v.
PITNEY BOWES, A Corporation; Pitney Bowes Long Term Disability Plan; George B. Harvey, as Trustee of Pitney Bowes Long Term Disability Plan; Carmine F. Adimando, as Trustee of Pitney Bowes Long Term Disability Plan; Pitney Bowes Group Life Insurance Plan; Pitney Bowes Retirement Plan; Pitney Bowes Major Medical Expense Plan; Pitney Bowes Dental Expense Plan; Michael Critelli, Appellees.

No. 93-3957.

United States Court of Appeals, Eighth Circuit.

Submitted June 14, 1994.
Decided September 13, 1994.

[715] [716] Sheldon Weinhaus, St. Louis, MO, argued, for appellant.

Keith Rabenberg, St. Louis, MO, argued. (Clark Cole, on the brief), for appellees.

Before MORRIS SHEPPARD ARNOLD, Circuit Judge, JOHN R. GIBSON, Senior Judge, and MELLOY,[1] District Judge.

MORRIS SHEPPARD ARNOLD, Circuit Judge.

Donald E. Conley initiated this action in the Circuit Court of Butler County, Missouri, against his employer Pitney Bowes after he had been denied continued disability benefits for a claim arising from injuries suffered in an automobile accident. The company removed the case to the United States District Court for the Eastern District of Missouri because the suit related to benefits under the Employee Retirement Income Security Act, 29 U.S.C. § 1001 et seq. (ERISA). The district court granted the defendants's motion for summary judgment, 839 F.Supp. 1364, and this appeal followed. At issue is whether a claimant must exhaust administrative procedures when, contrary to the requirements of his plan, the letter denying his benefits does not inform him of appeal procedures.

I.

ERISA does not explicitly require exhaustion of administrative or plan remedies. The doctrine is, in this context, a creature either of contract or judicial invention. We have required exhaustion in ERISA cases only when it was required by the particular plan involved. See Anderson v. Alpha Portland Industries, Inc., 727 F.2d 177, 180 (8th Cir.1984), aff'd, 752 F.2d 1293 (8th Cir. en banc 1985); cf. Kennedy v. Empire Blue Cross and Blue Shield, 989 F.2d 588, 594 (2nd Cir.1993) ("exhaustion in the context of ERISA requires only those administrative appeals provided for in the relevant plan or policy."). We have declined to apply a broader, judicially-crafted exhaustion requirement in ERISA actions. See Anderson v. Alpha Portland Industries, Inc., 752 F.2d 1293 (8th Cir. en banc 1985) (exhaustion not required for retirees absent explicit plan language extending plan requirements to them). The appellant concedes that the plan which is [717] the subject of the suit before us does contain, in fact, such a requirement.

The language of the plan requiring exhaustion is complimented, in this case, by language that requires that any notice of denial of benefits be accompanied by explicit instructions informing the plan participant of the procedures for appeal. Section 7.8(a) of the plan document requires that the plan administrator provide to "any person whose claim for benefits has been denied ... a written notification of the denial. The written notification shall include ... an explanation of the claim appeal procedure." This plan language comports with the requirements of 29 C.F.R. § 2560.503-1(f)(4), which dictates that the "[c]ontent of notice ... to every claimant who is denied a claim for benefits ... set[] forth ... [a]ppropriate information as to the steps to be taken if the participant or beneficiary wishes to submit his or her claim for review."

The present case, therefore, may be distilled to one of contract. Two terms of an ERISA plan are the focus of this dispute, namely, an exhaustion clause and a clause requiring notice of appeal procedures. In deciding whether Mr. Conley's action can survive a motion for summary judgment, "we must begin by examining the language of the plan document. Each provision should be read consistently with the others and the terms must be construed to render none of them nugatory." Jacobs v. Pickands Mather & Co., 933 F.2d 652, 657 (8th Cir.1991).

II.

A.

The terms that are at the center of this dispute are promises that were exchanged as part of a complex agreement. While pension and benefit plans are typically characterized as being unilateral contracts (agreements where an offer is accepted by a performance), the promises in the plan before us are more properly characterized as a bilateral contract (an agreement where promises of future performance are exchanged). See Arthur Linton Corbin, Corbin On Contracts § 21 (one vol. ed. 1952). Accordingly, the part of the plan under consideration is subject to the federal common law of contracts. See Pilot Life Insurance Company v. Dedeaux, 481 U.S. 41, 56, 107 S.Ct. 1549, 1557, 95 L.Ed.2d 39 (1987).

One well-established rule of contract construction is that "[i]n bilateral contracts for an agreed exchange of performances, ... where one party's performance is to be rendered prior in time to that of the other, it is a constructive condition precedent to the latter's duty." Lawrence P. Simpson, Handbook of the Law of Contracts § 152 (1965). See also Restatement (Second) of Contracts § 237 (1981) ("[I]t is a condition of each party's remaining duties to render performances to be exchanged under an exchange of promises that there be no material failure by the other party to render any such performance due at an earlier time."); E. Allan Farnsworth, Contracts § 8.2(B) (2d ed. 1990); John D. Calamari and Joseph M. Perillo, The Law of Contracts § 11-8 (1987); Corbin On Contracts § 657. Such a "performance is as much a condition precedent to the other's duty as though expressly made so." Simpson, § 152; See also, Loud v. Pomona Land & Water Co., 153 U.S. 564, 577, 14 S.Ct. 928, 932, 38 L.Ed. 822 (1894) (agreement to convey land "after the making of the payment and full performance" rendered such payment and performance a condition precedent to the duty to convey. (emphasis in original)). Furthermore, "[w]here the consideration given by each party to a contract consists in whole or in part of promises, all the performances to be rendered by each party taken collectively are treated as performances to be exchanged under an exchange of promises, unless a contrary intention is clearly manifested." Restatement (Second) of Contracts § 232.

Application of these principles to the case at hand is straightforward. Because appellees were obligated to inform appellant of the appeal procedure at the time they denied him benefits, appellees performance had necessarily to precede exhaustion by the plaintiff. A defense under the exhaustion clause, therefore, may not be asserted absent performance of the notice clause, since they [718] are presumed to be the subject of promises made in exchange for each other.

B.

The defendants-appellants maintain that failure to impose the exhaustion requirement would be contrary to the public policy behind such a requirement. We disagree. Exhaustion is a very important concept in our jurisprudence, with deep roots in the principles of federalism and comity. See, e.g., Rose v. Lundy, 455 U.S. 509, 518, 102 S.Ct. 1198, 1203, 71 L.Ed.2d 379 (1982). Among its several purposes in ERISA plans are:

(1) To reduce the number of frivolous law suits;
(2) To promote the consistent treatment of claimants;
(3) To provide a non-adversarial method of claims settlement;
(4) To minimize the cost of claims settlement for all concerned;
(5) To enhance the ability of trustees of benefit plans to expertly and efficiently manage their funds by preventing premature judicial intervention in their decision-making processes;
(6) To enhance the ability of trustees of benefit plans to correct their errors, [or convince a disappointed claimant that he is incorrect];
(7) To enhance the ability of trustees to interpret plan provisions; and
(8) To help assemble a factual record which will assist a court in reviewing the fiduciaries actions.

Costantino v. TRW, Inc., 13 F.3d 969, 975 (6th Cir.1994). We recognize that judicially-created exhaustion requirements also may further these goals. We believe, however, that the freedom of contract between autonomous parties is a more important principle than even the very important judicially-created doctrine of exhaustion. Furthermore, where exhaustion is a bargained-for term of a contract, freedom of contract is not necessarily inconsistent with the principles underlying exhaustion requirements.

Requiring plan administrators to provide notice of appeals procedure as required by contract and the Secretary's regulations is not inconsistent with the goals that exhaustion typically furthers. Indeed, such a requirement serves much the same purpose as the exhaustion clause, namely, to avert resort to federal litigation where an administrative procedure is available. In fact, inclusion of such a term serves to avoid not only frivolous suits, but mistakenly filed suits as well. To advance the purposes of the Act, the Secretary's regulations, the contract, and the principles underlying the exhaustion and notice terms, we must construe and enforce the whole contract, including the notice of appeals procedure requirement.

III.

In their motion for summary judgment and their supporting memorandum, the defendants-appellees rely expressly and exclusively upon Mr. Conley's failure to exhaust the plan's procedures. They do not allege that Mr. Conley had actual knowledge of the plan's procedures, thereby making any breach of the plan's notice requirements immaterial. The district court appears to have felt that the plaintiff-appellant's possession of the summary plan description gave him constructive knowledge of the appeals procedures. The terms of the plan and the requirements of the regulation, however, confer upon a claimant a right to more than just a copy of the summary plan description. He had a contractual right to information on the appeals procedure included with his notice of denial of benefits. On summary judgment, the movant is not entitled to the benefit of a legal rule that the summary plan description gave claimant constructive knowledge of the appeals procedures.

On appeal, the defendants-appellees further assert that Mr. Conley did not deny having actual knowledge of the plan's procedures. This argument, however, puts the cart before the horse. The defendants-appellees never alleged, either in their answer, their motion for summary judgment, or their memorandum in support of their motion, that Mr. Conley or his attorney had actual knowledge of the plan's appeals process. We do not think that Mr. Conley could be expected [719] to deny something of which he had not been accused.

IV.

Mr. Conley has also made claims under ERISA § 510 for wrongful discharge, and under ERISA § 409 for breach of fiduciary duty. He challenges the entry of summary judgment on these claims because, unlike claims for benefits, they are not within the purview of the plan's administrators and therefore not subject to the plan's exhaustion requirement. The defendant-appellees response to this argument is that it was waived because it was not presented to the district court for consideration upon the defendants-appellees motion for summary judgment.

The district court entered summary judgment on these claims without having been asked to. The motion for summary judgment does not refer specifically to the § 510 and § 409 counts. Therefore, the plaintiff was never placed on notice that he needed to argue that no exhaustion requirement existed for these two counts. Since he could not have known that the motion for summary judgment included the § 510 and § 409 counts, these claims must also be reinstated.

V.

For the foregoing reasons, we reverse the judgment of the district court, and remand for proceedings consistent with this opinion.

JOHN R. GIBSON, Senior Circuit Judge, dissenting.

I respectfully dissent.

I would affirm the judgment of the district court for the reasons articulated in its decision.

Conley's testimony is very clear that after he received the letter denying benefits he turned it over to his lawyer. He felt that he should be getting a pension, disability or something, so retained the lawyer to look after his interests. He let the lawyer handle it and do the work. In addition to the letter, he gave a copy of the benefit plans book to the lawyer. The booklet set forth in clear detail the claim appeal procedure.

The court today elevates form over substance and ignores the factual situation before the district court and on which it ruled. This is not a case where an employee failed to file an application for review because he was not told of the procedures, but rather one where the employee relied on his lawyer, who dropped the ball.

[1] The Honorable Michael J. Melloy, Chief United States District Judge for the Northern District of Iowa, sitting by designation.

9.7 Restatement (2d) Sections on Conditions 9.7 Restatement (2d) Sections on Conditions

Restatement (Second) of Contracts – Conditions

224 – Condition Defined

A condition is an event, not certain to occur, which must occur, unless its non-occurrence is excused, before performance under a contract becomes due.

227 – Standards of Preference with Regard to Conditions

(1) In resolving doubts as to whether an event is made a condition of an obligor's duty, and as to the nature of such an event, an interpretation is preferred that will reduce the obligee's risk of forfeiture, unless the event is within the obligee's control or the circumstances indicate that he has assumed the risk.

(2) Unless the contract is of a type under which only one party generally undertakes duties, when it is doubtful whether

(a) a duty is imposed on an obligee that an event occur, or

(b) the event is made a condition of the obligor's duty, or

(c) the event is made a condition of the obligor's duty and a duty is imposed on the obligee that the event occur,

the first interpretation is preferred if the event is within the obligee's control.

(3) In case of doubt, an interpretation under which an event is a condition of an obligor's duty is preferred over an interpretation under which the non-occurrence of the event is a ground for discharge of that duty after it has become a duty to perform.

234 – Order of Performances

(1) Where all or part of the performances to be exchanged under an exchange of promises can be rendered simultaneously, they are to that extent due simultaneously, unless the language or the circumstances indicate the contrary.

(2) Except to the extent stated in Subsection (1), where the performance of only one party under such an exchange requires a period of time, his performance is due at an earlier time than that of the other party, unless the language or the circumstances indicate the contrary.

238 -- Effect on Other Party's Duties of a Failure to Offer Performance

Where all or part of the performances to be exchanged under an exchange of promises are due simultaneously, it is a condition of each party's duties to render such performance that the other party either render or, with manifested present ability to do so, offer performance of his part of the simultaneous exchange.

 

 

9.8 UCC 2-207 Delivery in Single Lot or Several Lots 9.8 UCC 2-207 Delivery in Single Lot or Several Lots

2-307. Delivery in Single Lot or Several Lots.

Unless otherwise agreed all goods called for by a contract for sale must be tendered in a single delivery and payment is due only on such tender but where the circumstances give either party the right to make or demand delivery in lots the price if it can be apportioned may be demanded for each lot.

9.9 Ramirez v. Autosport 9.9 Ramirez v. Autosport

88 N.J. 277 (1982)
440 A.2d 1345

ERNEST RAMIREZ AND ADELE RAMIREZ, PLAINTIFFS-RESPONDENTS,
v.
AUTOSPORT, A CORPORATION OF THE STATE OF NEW JERSEY, DEFENDANT-APPELLANT.

The Supreme Court of New Jersey.

Argued December 14, 1981.
Decided February 4, 1982.

[281] Leonard Rosenstein argued the cause for appellant (Feuerstein, Sachs & Maitlin, attorneys).

Leo Kaplowitz argued the cause for respondents (Kaplowitz & Wise, attorneys).

The opinion of the Court was delivered by POLLOCK, J.

This case raises several issues under the Uniform Commercial Code ("the Code" and "UCC") concerning whether a buyer may reject a tender of goods with minor defects and whether a seller may cure the defects. We consider also the remedies available to the buyer, including cancellation of the contract. The main issue is whether plaintiffs, Mr. and Mrs. Ramirez, could reject the tender by defendant, Autosport, of a camper van with minor defects and cancel the contract for the purchase of the van.

The trial court ruled that Mr. and Mrs. Ramirez rightfully rejected the van and awarded them the fair market value of their trade-in van. The Appellate Division affirmed in a brief per curiam decision which, like the trial court opinion, was unreported. We affirm the judgment of the Appellate Division.

I

Following a mobile home show at the Meadowlands Sports Complex, Mr. and Mrs. Ramirez visited Autosport's showroom in Somerville. On July 20, 1978 the Ramirezes and Donald Graff, a [282] salesman for Autosport, agreed on the sale of a new camper and the trade-in of the van owned by Mr. and Mrs. Ramirez. Autosport and the Ramirezes signed a simple contract reflecting a $14,100 purchase price for the new van with a $4,700 trade-in allowance for the Ramirez van, which Mr. and Mrs. Ramirez left with Autosport. After further allowance for taxes, title and documentary fees, the net price was $9,902. Because Autosport needed two weeks to prepare the new van, the contract provided for delivery on or about August 3, 1978.

On that date, Mr. and Mrs. Ramirez returned with their checks to Autosport to pick up the new van. Graff was not there so Mr. White, another salesman, met them. Inspection disclosed several defects in the van. The paint was scratched, both the electric and sewer hookups were missing, and the hubcaps were not installed. White advised the Ramirezes not to accept the camper because it was not ready.

Mr. and Mrs. Ramirez wanted the van for a summer vacation and called Graff several times. Each time Graff told them it was not ready for delivery. Finally, Graff called to notify them that the camper was ready. On August 14 Mr. and Mrs. Ramirez went to Autosport to accept delivery, but workers were still touching up the outside paint. Also, the camper windows were open, and the dining area cushions were soaking wet. Mr. and Mrs. Ramirez could not use the camper in that condition, but Mr. Leis, Autosport's manager, suggested that they take the van and that Autosport would replace the cushions later. Mrs. Ramirez counteroffered to accept the van if they could withhold $2,000, but Leis agreed to no more than $250, which she refused. Leis then agreed to replace the cushions and to call them when the van was ready.

On August 15, 1978 Autosport transferred title to the van to Mr. and Mrs. Ramirez, a fact unknown to them until the summer of 1979. Between August 15 and September 1, 1978 Mrs. Ramirez called Graff several times urging him to complete the preparation of the van, but Graff constantly advised her [283] that the van was not ready. He finally informed her that they could pick it up on September 1.

When Mr. and Mrs. Ramirez went to the showroom on September 1, Graff asked them to wait. And wait they did — for one and a half hours. No one from Autosport came forward to talk with them, and the Ramirezes left in disgust.

On October 5, 1978 Mr. and Mrs. Ramirez went to Autosport with an attorney friend. Although the parties disagreed on what occurred, the general topic was whether they should proceed with the deal or Autosport should return to the Ramirezes their trade-in van. Mrs. Ramirez claimed they rejected the new van and requested the return of their trade-in. Mr. Lustig, the owner of Autosport, thought, however, that the deal could be salvaged if the parties could agree on the dollar amount of a credit for the Ramirezes. Mr. and Mrs. Ramirez never took possession of the new van and repeated their request for the return of their trade-in. Later in October, however, Autosport sold the trade-in to an innocent third party for $4,995. Autosport claimed that the Ramirez' van had a book value of $3,200 and claimed further that it spent $1,159.62 to repair their van. By subtracting the total of those two figures, $4,159.62, from the $4,995.00 sale price, Autosport claimed a $600-700 profit on the sale.

On November 20, 1978 the Ramirezes sued Autosport seeking, among other things, rescission of the contract. Autosport counterclaimed for breach of contract.

II

Our initial inquiry is whether a consumer may reject defective goods that do not conform to the contract of sale. The basic issue is whether under the UCC, adopted in New Jersey as N.J.S.A. 12A:1-101 et seq., a seller has the duty to deliver goods that conform precisely to the contract. We conclude that the seller is under such a duty to make a "perfect tender" and that a buyer has the right to reject goods that do not conform to the [284] contract. That conclusion, however, does not resolve the entire dispute between buyer and seller. A more complete answer requires a brief statement of the history of the mutual obligations of buyers and sellers of commercial goods.

In the nineteenth century, sellers were required to deliver goods that complied exactly with the sales agreement. See Filley v. Pope, 115 U.S. 213, 220, 6 S.Ct. 19, 21, 29 L.Ed. 372, 373 (1885) (buyer not obliged to accept otherwise conforming scrap iron shipped to New Orleans from Leith, rather than Glasgow, Scotland, as required by contract); Columbian Iron Works & Dry-Dock Co. v. Douglas, 84 Md. 44, 47, 34 A. 1118, 1120-1121 (1896) (buyer who agreed to purchase steel scrap from United States cruisers not obliged to take any other kind of scrap). That rule, known as the "perfect tender" rule, remained part of the law of sales well into the twentieth century. By the 1920's the doctrine was so entrenched in the law that Judge Learned Hand declared "[t]here is no room in commercial contracts for the doctrine of substantial performance." Mitsubishi Goshi Kaisha v. J. Aron & Co., Inc., 16 F.2d 185, 186 (2 Cir.1926).

The harshness of the rule led courts to seek to ameliorate its effect and to bring the law of sales in closer harmony with the law of contracts, which allows rescission only for material breaches. LeRoy Dyal Co. v. Allen, 161 F.2d 152, 155 (4 Cir.1947). See 5 Corbin, Contracts § 1104 at 464 (1951); 12 Williston, Contracts § 1455 at 14 (3 ed. 1970). Nevertheless, a variation of the perfect tender rule appeared in the Uniform Sales Act. N.J.S.A. 46:30-75 (purchasers permitted to reject goods or rescind contracts for any breach of warranty); N.J.S.A. 46:30-18 to -21 (warranties extended to include all the seller's obligations to the goods). See Honnold, "Buyer's Right of Rejection, A Study in the Impact of Codification Upon a Commercial Problem", 97 U.Pa.L.Rev. 457, 460 (1949). The chief objection to the continuation of the perfect tender rule was that buyers in a declining market would reject goods for minor nonconformities and force the loss on surprised sellers. See Hawkland, Sales and Bulk Sales Under the Uniform Commercial [285] Code, 120-122 (1958), cited in N.J.S.A. 12A:2-508, New Jersey Study Comment 3.

To the extent that a buyer can reject goods for any nonconformity, the UCC retains the perfect tender rule. Section 2-106 states that goods conform to a contract "when they are in accordance with the obligations under the contract". N.J.S.A. 12A:2-106. Section 2-601 authorizes a buyer to reject goods if they "or the tender of delivery fail in any respect to conform to the contract". N.J.S.A. 12A:2-601. The Code, however, mitigates the harshness of the perfect tender rule and balances the interests of buyer and seller. See Restatement (Second), Contracts, § 241 comment (b) (1981). The Code achieves that result through its provisions for revocation of acceptance and cure. N.J.S.A. 12A:2-608, 2-508.

Initially, the rights of the parties vary depending on whether the rejection occurs before or after acceptance of the goods. Before acceptance, the buyer may reject goods for any nonconformity. N.J.S.A. 12A:2-601. Because of the seller's right to cure, however, the buyer's rejection does not necessarily discharge the contract. N.J.S.A. 12A:2-508. Within the time set for performance in the contract, the seller's right to cure is unconditional. Id., subsec. (1); see id., Official Comment 1. Some authorities recommend granting a breaching party a right to cure in all contracts, not merely those for the sale of goods. Restatement (Second), Contracts, ch. 10, especially §§ 237 and 241. Underlying the right to cure in both kinds of contracts is the recognition that parties should be encouraged to communicate with each other and to resolve their own problems. Id., Introduction p. 193.

The rights of the parties also vary if rejection occurs after the time set for performance. After expiration of that time, the seller has a further reasonable time to cure if he believed reasonably that the goods would be acceptable with or without a money allowance. N.J.S.A. 12A:2-508(2). The determination of what constitutes a further reasonable time depends on the [286] surrounding circumstances, which include the change of position by and the amount of inconvenience to the buyer. N.J.S.A. 12A:2-508, Official Comment 3. Those circumstances also include the length of time needed by the seller to correct the nonconformity and his ability to salvage the goods by resale to others. See Restatement (Second), Contracts, § 241 comment (d). Thus, the Code balances the buyer's right to reject nonconforming goods with a "second chance" for the seller to conform the goods to the contract under certain limited circumstances. N.J.S.A. 12A:2-508, New Jersey Study Comment 1.

After acceptance, the Code strikes a different balance: the buyer may revoke acceptance only if the nonconformity substantially impairs the value of the goods to him. N.J.S.A. 12A:2-608. See Herbstman v. Eastman Kodak Co., 68 N.J. 1, 9 (1975). See generally, Priest, "Breach and Remedy for the Tender of Non-Conforming Goods under the Uniform Commercial Code: An Economic Approach," 91 Harv.L.Rev. 960, 971-973 (1978). This provision protects the seller from revocation for trivial defects. Herbstman, supra, 68 N.J. at 9. It also prevents the buyer from taking undue advantage of the seller by allowing goods to depreciate and then returning them because of asserted minor defects. See White & Summers, Uniform Commercial Code, § 8-3 at 391 (2 ed. 1980). Because this case involves rejection of goods, we need not decide whether a seller has a right to cure substantial defects that justify revocation of acceptance. See Pavesi v. Ford Motor Co., 155 N.J. Super. 373, 378 (App.Div. 1978) (right to cure after acceptance limited to trivial defects) and White & Summers, supra, § 8-4 at 319 n. 76 (open question as to the relationship between §§ 2-608 and 2-508).

Other courts agree that the buyer has a right of rejection for any nonconformity, but that the seller has a countervailing right to cure within a reasonable time. Marine Mart Inc. v. Pearce, 252 Ark. 601, 480 S.W.2d 133, 137 (1972). See Intermeat, Inc. v. American Poultry, Inc., 575 F.2d 1017, 1024 (2 Cir.1978); Moulton Cavity & Mold., Inc. v. Lyn-Flex Industries, 396 A.2d 1024, [287] 1027 n. 6 (Me. 1979); Uchitel v. F.R. Tripler & Co., 107 Misc.2d 310, 316, 434 N.Y.S.2d 77, 81 (App.Term 1980); Rutland Music Services, Inc. v. Ford Motor Co., 422 A.2d 248, 249 (Vt. 1980). But see McKenzie v. Alla-Ohio Coals, Inc., 29 U.C.C.Rep. 852, 856-857 (D.D.C. 1979).

One New Jersey case, Gindy Mfg. Corp. v. Cardinale Trucking Corp., suggests that, because some defects can be cured, they do not justify rejection. 111 N.J. Super. 383, 387 n. 1 (Law Div. 1970). Accord, Adams v. Tremontin, 42 N.J. Super. 313, 325 (App.Div. 1956) (Uniform Sales Act). But see Sudol v. Rudy Papa Motors, 175 N.J. Super. 238, 240-241 (D.Ct. 1980) (§ 2-601 contains perfect tender rule). Nonetheless, we conclude that the perfect tender rule is preserved to the extent of permitting a buyer to reject goods for any defects. Because of the seller's right to cure, rejection does not terminate the contract. Accordingly, we disapprove the suggestion in Gindy that curable defects do not justify rejection.

A further problem, however, is identifying the remedy available to a buyer who rejects goods with insubstantial defects that the seller fails to cure within a reasonable time. The Code provides expressly that when "the buyer rightfully rejects, then with respect to the goods involved, the buyer may cancel." N.J.S.A. 12A:2-711. "Cancellation" occurs when either party puts an end to the contract for breach by the other. N.J.S.A. 12A:2-106(4). Nonetheless, some confusion exists whether the equitable remedy of rescission survives under the Code. Compare Ventura v. Ford Motor Corp., 173 N.J. Super. 501, 503 (Ch.Div. 1980), aff'd 180 N.J. Super. 45 (App.Div. 1981) (rescission under UCC) and Pavesi v. Ford Motor Corp., supra, 155 N.J. Super. at 377 (equitable remedies still available since not specifically superceded, § 1-103) with Edelstein v. Toyota Motors Dist., 176 N.J. Super. 57, 63-64 (App.Div. 1980) (under UCC rescission is revocation of acceptance) and Sudol v. Rudy Papa Motors, supra, 175 N.J. Super. at 241-242 (under UCC, rescission no longer exists as such).

[288] The Code eschews the word "rescission" and substitutes the terms "cancellation", "revocation of acceptance", and "rightful rejection". N.J.S.A. 12A:2-106(4); 2-608; and 2-711 & Official Comment 1. Although neither "rejection" nor "revocation of acceptance" is defined in the Code, rejection includes both the buyer's refusal to accept or keep delivered goods and his notification to the seller that he will not keep them. White & Summers, supra, § 8-1 at 293. Revocation of acceptance is like rejection, but occurs after the buyer has accepted the goods. Nonetheless, revocation of acceptance is intended to provide the same relief as rescission of a contract of sale of goods. N.J.S.A. 12A:2-608 Official Comment 1; N.J. Study Comment 2. In brief, revocation is tantamount to rescission. See Herbstman v. Eastman Kodak Co., supra, 68 N.J. at 9; accord, Peckham v. Larsen Chevrolet-Buick-Oldsmobile, Inc., 99 Idaho 675, 677, 587 P.2d 816, 818 (1978) (rescission and revocation of acceptance amount to the same thing). Similarly, subject to the seller's right to cure, a buyer who rightfully rejects goods, like one who revokes his acceptance, may cancel the contract. N.J.S.A. 12A:2-711 & Official Comment 1. We need not resolve the extent to which rescission for reasons other than rejection or revocation of acceptance, e.g. fraud and mistake, survives as a remedy outside the Code. Compare N.J.S.A. 12A:1-103 and White & Summers, supra, § 8-1, p. 295, with N.J.S.A. 12A:2-721. Accordingly, we approve Edelstein and Sudol, which recognize that explicit Code remedies replace rescission, and disapprove Ventura and Pavesi to the extent they suggest the UCC expressly recognizes rescission as a remedy.

Although the complaint requested rescission of the contract, plaintiffs actually sought not only the end of their contractual obligations, but also restoration to their pre-contractual position. That request incorporated the equitable doctrine of restitution, the purpose of which is to restore plaintiff to as good a position as he occupied before the contract. Corbin, supra, § 1102 at 455. In UCC parlance, plaintiffs' request was for the cancellation [289] of the contract and recovery of the price paid. N.J.S.A. 12A:2-106(4), 2-711.

General contract law permits rescission only for material breaches, and the Code restates "materiality" in terms of "substantial impairment". See Herbstman v. Eastman Kodak Co., supra, 68 N.J. at 9; id. at 15 (Conford, J., concurring). The Code permits a buyer who rightfully rejects goods to cancel a contract of sale. N.J.S.A. 12A:2-711. Because a buyer may reject goods with insubstantial defects, he also may cancel the contract if those defects remain uncured. Otherwise, a seller's failure to cure minor defects would compel a buyer to accept imperfect goods and collect for any loss caused by the nonconformity. N.J.S.A. 12A:2-714.

Although the Code permits cancellation by rejection for minor defects, it permits revocation of acceptance only for substantial impairments. That distinction is consistent with other Code provisions that depend on whether the buyer has accepted the goods. Acceptance creates liability in the buyer for the price, N.J.S.A. 12A:2-709(1), and precludes rejection. N.J.S.A. 12A:2-607(2); N.J.S.A. 12A:2-606, New Jersey Study Comment 1. Also, once a buyer accepts goods, he has the burden to prove any defect. N.J.S.A. 12A:2-607(4); White & Summers, supra, § 8-2 at 297. By contrast, where goods are rejected for not conforming to the contract, the burden is on the seller to prove that the nonconformity was corrected. Miron v. Yonkers Raceway, Inc., 400 F.2d 112, 119 (2 Cir.1968).

Underlying the Code provisions is the recognition of the revolutionary change in business practices in this century. The purchase of goods is no longer a simple transaction in which a buyer purchases individually-made goods from a seller in a face-to-face transaction. Our economy depends on a complex system for the manufacture, distribution, and sale of goods, a system in which manufacturers and consumers rarely meet. Faceless manufacturers mass-produce goods for unknown consumers who purchase those goods from merchants exercising [290] little or no control over the quality of their production. In an age of assembly lines, we are accustomed to cars with scratches, television sets without knobs and other products with all kinds of defects. Buyers no longer expect a "perfect tender". If a merchant sells defective goods, the reasonable expectation of the parties is that the buyer will return those goods and that the seller will repair or replace them.

Recognizing this commercial reality, the Code permits a seller to cure imperfect tenders. Should the seller fail to cure the defects, whether substantial or not, the balance shifts again in favor of the buyer, who has the right to cancel or seek damages. N.J.S.A. 12A:2-711. In general, economic considerations would induce sellers to cure minor defects. See generally Priest, supra, 91 Harv.L.Rev. 973-974. Assuming the seller does not cure, however, the buyer should be permitted to exercise his remedies under N.J.S.A. 12A:2-711. The Code remedies for consumers are to be liberally construed, and the buyer should have the option of cancelling if the seller does not provide conforming goods. See N.J.S.A. 12A:1-106.

To summarize, the UCC preserves the perfect tender rule to the extent of permitting a buyer to reject goods for any nonconformity. Nonetheless, that rejection does not automatically terminate the contract. A seller may still effect a cure and preclude unfair rejection and cancellation by the buyer. N.J.S.A. 12A:2-508, Official Comment 2; N.J.S.A. 12A:2-711, Official Comment 1.

III

The trial court found that Mr. and Mrs. Ramirez had rejected the van within a reasonable time under N.J.S.A. 12A:2-602. The court found that on August 3, 1978 Autosport's salesman advised the Ramirezes not to accept the van and that on August 14, they rejected delivery and Autosport agreed to replace the cushions. Those findings are supported by substantial credible evidence, and we sustain them. See Rova Farms [291] Resort v. Investors Ins. Co., 65 N.J. 474, 483-484 (1974). Although the trial court did not find whether Autosport cured the defects within a reasonable time, we find that Autosport did not effect a cure. Clearly the van was not ready for delivery during August, 1978 when Mr. and Mrs. Ramirez rejected it, and Autosport had the burden of proving that it had corrected the defects. Although the Ramirezes gave Autosport ample time to correct the defects, Autosport did not demonstrate that the van conformed to the contract on September 1. In fact, on that date, when Mr. and Mrs. Ramirez returned at Autosport's invitation, all they received was discourtesy.

On the assumption that substantial impairment is necessary only when a purchaser seeks to revoke acceptance under N.J.S.A. 12A:2-608, the trial court correctly refrained from deciding whether the defects substantially impaired the van. The court properly concluded that plaintiffs were entitled to "rescind" — i.e., to "cancel" — the contract.

Because Autosport had sold the trade-in to an innocent third party, the trial court determined that the Ramirezes were entitled not to the return of the trade-in, but to its fair market value, which the court set at the contract price of $4,700. A buyer who rightfully rejects goods and cancels the contract may, among other possible remedies, recover so much of the purchase price as has been paid. N.J.S.A. 12A:2-711. The Code, however, does not define "pay" and does not require payment to be made in cash.

A common method of partial payment for vans, cars, boats and other items of personal property is by a "trade-in". When concerned with used vans and the like, the trade-in market is an acceptable, and perhaps the most appropriate, market in which to measure damages. It is the market in which the parties dealt; by their voluntary act they have established the value of the traded-in article. See Frantz Equipment Co. v. Anderson, 37 N.J. 420, 431-432 (1962) (in computing purchaser's damages for alleged breach of uniform conditional sales law, trade-in value [292] of tractor was appropriate measure); accord, California Airmotive Corp. v. Jones, 415 F.2d 554, 556 (6 Cir.1969). In other circumstances, a measure of damages other than the trade-in value might be appropriate. See Chemical Bank v. Miller Yacht Sales, 173 N.J. Super. 90, 103 (App.Div. 1980) (in determining value of security interest in boat, court rejected both book value and contract trade-in value and adopted resale value as appropriate measure of damages).

The ultimate issue is determining the fair market value of the trade-in. This Court has defined fair market value as "the price at which the property would change hands between a willing buyer and a willing seller when the former is not under any compulsion to buy and the latter is not under any compulsion to sell, both parties having reasonable knowledge of relevant facts." In re Estate of Romnes, 79 N.J. 139, 144 (1978). Although the value of the trade-in van as set forth in the sales contract was not the only possible standard, it is an appropriate measure of fair market value.

For the preceding reasons, we affirm the judgment of the Appellate Division.

For affirmance — Chief Justice WILENTZ and Justices PASHMAN, CLIFFORD, SCHREIBER, HANDLER, POLLOCK and O'HERN — 7.

For reversal — None.

9.10 Beck & Pauli Lithographing Co. v. Colorado Milling & Elevator Co. 9.10 Beck & Pauli Lithographing Co. v. Colorado Milling & Elevator Co.

52 F. 700

BECK & PAULI LITHOGRAPHING CO.
v.
COLORADO MILLING & ELEVATOR CO.

Circuit Court of Appeals, Eighth Circuit.
October 31, 1892.
No. 141.

[701] In Error to the Circuit Court of the United States for the District of Colorado. Reversed.

Statement by SANBORN, Circuit Judge:

This was an action by the plaintiff in error to recover the contract price of certain stationery and advertising matter furnished the defendant. It was tried on the merits, and at the close of the evidence the court instructed the jury to return a verdict for the defendant, and this instruction is assigned as error. The plaintiff was a corporation of Wisconsin, engaged in lithographing and printing, and its principal place of business was at Milwaukee, in that state. The defendant was a corporation of Colorado, engaged in the business of milling, and its principal place of business was at Denver, in that state. In June, 1889, the plaintiff agreed to make new designs of certain buildings of defendant, with sketches of its trade-marks; to execute engravings thereof in a strictly first-class style; to embody these on the stationery described below; to submit to defendant for approval proofs thereof; to submit designs and proofs of hangers, on fine chromo plate, for advertising defendant's business, by the following fall; to engrave a strictly first-class vignette of one of defendant's plants; to submit a sketch and proof thereof to defendant; to furnish defendant with 10,000 business cards and 5,000 checks in August, 1889; to furnish, in the course of the year, letter heads, noteheads, billheads, statements, bills, envelopes, and cards to the defendant to the number of 331,100, and 5,000 hangers; and to furnish the vignette and 5,000 hangers more after the approval of the proofs thereof by the defendant. The defendant agreed to take and pay for this stationery, this vignette, and these hangers at certain agreed prices, which amounted in the aggregate to about $6,000. The plaintiff furnished the 10,000 cards and 5,000 checks required under the contract in August, 1889, and the defendant received and paid for them. The plaintiff introduced testimony to the effect that it strictly complied with and fully performed these contracts in every respect, except that it shipped the articles contracted for (which were not delivered in August) by rail from Milwaukee to the defendant, at Denver, in December, 1889, in five boxes, four of which did not arrive at Denver until 9:42 A.M., January 1, 1890, and the fifth did not arrive there until January 4, 1890; that before January 8, 1890, all of these articles were tendered to the defendant, and it refused to examine or receive them; that the sketches and proofs of the designs, trade-marks, and hangers had been submitted to and approved by the defendant during the summer and fall of 1889, before these articles were manufactured, and that the last proof was approved November 16, 1889; that on December 16, 1889, the defendant wrote the plaintiff to forward by express 2,000 statements and 3,000 envelopes ‘as per [702] proofs submitted;‘ that the state of the art and process of lithographing is such that, after the general idea of a piece of work is conceived, it is customary to make first a pencil design, and, when this is found satisfactory, to prepare a colored sketch where colored work is required; that after the sketch is colored it is lithographed, that is, transferred to a stone; that each color requires a separate stone; and in these hangers there were nine colors; that it requires from two to three months to reproduce on stone a colored sketch like that used for the hangers; that the artists' work and the reproduction on stone were the most expensive parts of this work contracted for; and that the expense of the materials and printing was but a small part of the entire expense of the work.

F. W. v. Cotzhausen, for plaintiff in error.

V. D. Markham, for defendant in error.

Before CALDWELL and SANBORN, Circuit Judges, and SHIRAS, District Judge.

SANBORN, Circuit Judge, (after stating the facts.)

The ground on which it is sought to sustain the instruction of the court below to return a verdict for the defendant in this case is that the plaintiff failed to tender or deliver the articles contracted for to the defendant, at Denver, until six or eight days after the expiration of the year, that the plaintiff did not therefore furnish them ‘in the course of the year,‘ and that this failure justified the defendant in repudiating the contract, and refusing to pay any part of the contract price.

It is a general principle governing the construction of contracts that stipulations as to the time of their performance are not necessarily of their essence, unless it clearly appears in the given case from the express stipulations of the contract or the nature of its subject-matter that the parties intended performance within the time fixed in the contract to be a condition precedent to its enforcement, and, where the intention of the parties does not so appear, performance shortly after the time limited on the part of either party will not justify a refusal to perform by the party aggrieved, but his only remedy will be an action or counterclaim for the damages he has sustained from the breach of the stipulations. In the application of this principle to the cases as they have arisen, in the promulgation of the rules naturally deduced from it, and in the assignment of the various cases to the respective classes in which the stipulation as to time of performance is, or is not, deemed of the essence of the contract, the controlling consideration has been, and ought to be, to so decide and classify the cases that unjust penalties may not be inflicted, nor unreasonable damages recovered. Thus, in the ordinary contract of merchants for the sale and delivery, or the manufacture and sale, of marketable commodities within a time certain, it has been held that performance within the time is a condition precedent to the enforcement of the contract, and that a failure in this regard would justify the aggrieved party in refusing performance at a later day. Norrington v. Wright, 115 U.S. 188-203, 6 Sup.Ct.Rep. 12. This application of the general principle commends itself as just and reasonable, [703] on account of the frequent and rapid interchange and use of such commodities made necessary by the demands of commerce, and because such goods, if not received in time by the vendee, may usually be sold to others by the vendor at small loss, and thus he may himself measure the damages he ought to suffer from his delay by the difference in the market value of his goods. On the other hand, it has been held that an express stipulation in a contract for the construction of a house, that it should be completed on a day certain, and that, in case of failure to complete it within the time limited, the builder would forfeit $1,000, would not justify the owner of the land on which the house was constructed in refusing to accept it for a breach of this stipulation when the house was completed shortly after the time fixed, nor even in retaining the penalty stipulated in the contract, but that he must perform his part of the contract, and that he could retain from or recover of the builder the damages he sustained by the delay and those only. Tayloe v. Sandiford, 7 Wheat. 13, 17. This application of the general rule is equally just and reasonable. The lumber and material bestowed on a house by a builder become of little comparative value to him, while they are ordinarily of much greater value to the owner of the land on which it stands, and to permit the latter to escape payment because his house is completed a few days later than the contract requires would result in great injustice to the contractor, while the rule adopted fully protects the owner, and does no injustice to any one. The cases just referred to illustrate two well-settled rules of law which have been deduced from this general principle, and in accordance with which this case must be determined. They are:

In contracts of merchants for the sale and delivery or for the manufacture and sale of marketable commodities a statement descriptive of the subject-matter, or some material incident, such as the time of shipment, is a condition precedent, upon the failure or nonperformance of which the party aggrieved may repudiate the whole contract. Norrington v. Wright, 115 U.S. 188, 203, 6 Sup.Ct.Rep. 12; Rolling Mill v. Rhodes, 121 U.S. 255, 261, 7 Sup.Ct.Rep. 882. But in contracts for work or skill, and the materials upon which it is to be bestowed, a statement fixing the time of performance of the contract is not ordinarily of its essence, and a failure to perform within the time stipulated, followed by substantial performance after a short delay, will not justify the aggrieved party in repudiating the entire contract, but will simply give him his action for damages for the breach of the stipulation. Tayloe v. Sandiford, 7 Wheat. 13, 17; Hambly v. Railroad Co., 21 Fed.Rep. 541, 544, 554, 557.

It only remains to determine whether the contracts in the case at bar are the ordinary contracts of merchants for the manufacture and sale of marketable commodities or contracts for labor, skill, and materials, and this is not a difficult task. A contract to manufacture and furnish articles for the especial, exclusive, and peculiar use of another, with special features which he requires, and which render them of value to him, but useless and unsalable to others,— articles whose chief cost and value are [704] derived from the labor and skill bestowed upon them, and not from the materials of which they are made,— is a contract for work and labor, and not a contract of sale. Engraving Co. v. Moore, 75 Wis. 170, 172, 43 N.W.Rep. 1124; Goddard v. Binney, 115 Mass. 450; Hinds v. Kellogg, (Com. Pl. N.Y.) 13 N.Y.Supp. 922; Turner v. Mason, (Mich.) 32 N.W.Rep. 846. Thus in Engraving Co. v. Moore, supra, where the lithographing company had contracted to manufacture a large quantity of engravings and lithographs for a theatrical manager, with special features, useful to him only during a certain season, and they were completed and set aside in the rooms of the lithographer, and there burned before delivery to the manager, the court held that the contract was not one for the sale of personal property, but one for work, skill, and materials, because it was not the materials, but the lithographer's work of skill, that gave the value to the finished advertisements, and was the actual subject-matter of the contract, and because that work and skill, while it added the chief value to the finished articles for the especial use of the defendant, made both the articles and the materials worthless for all other purposes.

The contracts in the case we are considering were not for the blank paper on which they were finally impressed; that was of small value in proportion to the value of the finished articles; they were not for the sale of anything then in existence; they were for the artistic skill and labor of the employes of the defendant in preparing the sketches and designs, transferring them upon stone, and finally impressing them upon the paper the defendant was to furnish; and they authorized the plaintiff, without other orders than the contracts themselves, and the approvals of the designs and proofs there called for, to prepare and furnish all the articles named in the contracts and to collect the contract price therefor. These contracts required the names of defendant's mills and its trademarks to be so impressed upon all these articles that when they were completed they were not only unsalable to all others, but worthless to plaintiff for all purposes but waste paper. The contracts are evidence that on December 31, 1889, the articles contracted for would have been worth about $6,000 to the defendant, and if a few days later, when they were tendered, they were not worth so much, the defendant may recover the damages it suffered from the delay from December 31, 1889, to the date of the tender, in a proper action therefor, or may have the same allowed in this action under proper pleadings and proofs, and no injustice will result; while, if the defendant was permitted on account of this delay to utterly repudiate the contract, the plaintiff must practically lose the entire $6,000. The contracts contain no stipulation from which it can be fairly inferred that the parties intended the time of performance to be even material; indeed, they strongly indicate the contrary. They provide that a certain portion of the articles shall be furnished in two months that the remainder of the stationery and 5,000 hangers shall be furnished in the course of the year, and that 5,000 hangers more and the vignette shall be furnished within a reasonable time after the proofs are approved by the defendant; there is no stipulation for the payment [705] of any damages or the avoidance of the contracts on account of a failure to perform within any of the times stipulated in the contracts, and the parties themselves proceeded so leisurely thereunder that the first and only admitted request by the defendant for the delivery of any of the articles not delivered in August was on December 16, 1889. In Tayloe v. Sandiford, supra, the court refused to permit the owner to retain the $1,000 which the house builder had expressly agreed to pay if he failed to complete the house within the time fixed in the contract. In the absence of any such stipulation, or any clearly-expressed intent that time should be material even, it would be clearly unjustified by the law and inequitable to hold that the plaintiff is compelled to forfeit his entire contract price on account of this trifling delay that may have been immaterial to the defendant, and, if not, may be fully compensated in damages.

The result is that these contracts were not for the sale and delivery, or the manufacture and delivery, of marketable commodities. They were contracts for artistic skill and labor, and the materials on which they were to be bestowed in the manufacture of articles which were not salable to any one but the defendant when completed because impressed with special features useful only to it. There was nothing in the contracts or their subject-matter indicating any intention of the parties that the stipulations as to time should be deemed of their essence; and the defendant was not justified on account of the slight delay disclosed by the record in refusing to accept the goods, or in repudiating the entire contract. This conclusion disposes of the case, and it is unnecessary to notice other errors assigned. The judgment below is reversed, and the cause remanded for further proceedings not inconsistent with this opinion.

9.11 Plante v. Jacobs 9.11 Plante v. Jacobs

10 Wis.2d 567 (1960)

PLANTE, Respondent,
v.
JACOBS and wife, Appellants.[1]

Supreme Court of Wisconsin.

May 4, 1960.
June 7, 1960.

[569] For the appellants there were briefs and oral argument by Howard H. Boyle, Jr., of Milwaukee.

[570] For the respondent there was a brief and oral argument by Richard S. Hippenmeyer of Waukesha.

HALLOWS, J.

The defendants argue that the plaintiff cannot recover any amount because he has failed to substantially perform the contract. The plaintiff conceded he failed to furnish the kitchen cabinets, gutters and downspouts, sidewalk, closet clothes poles, and entrance seat amounting to $1,601.95. This amount was allowed to the defendants. The defendants claim some 20 other items of incomplete or faulty performance by the plaintiff and no substantial performance because the cost of completing the house in strict compliance with the plans and specifications would amount to 25 or 30 per cent of the contract price. The defendants especially stress the misplacing of the wall between the living room and the kitchen, which narrowed the living room in excess of one foot. The cost of tearing down this wall and rebuilding it would be approximately $4,000. The record is not clear why and when this wall was misplaced, but the wall is completely built and the house decorated and the defendants are living therein. Real-estate experts testified that the smaller width of the living room would not affect the market price of the house.

The defendants rely on Manitowoc Steam Boiler Works v. Manitowoc Glue Co. (1903), 120 Wis. 1, 97 N. W. 515, for the proposition that there can be no recovery on the contract as distinguished from quantum meruit unless there is substantial performance. This is undoubtedly the correct rule at common law. For recovery on quantum meruit, see Valentine v. Patrick Warren Construction Co. (1953), 263 Wis. 143, 56 N. W. (2d) 860. The question here is whether there has been substantial performance. The test of what amounts to substantial performance seems to be whether the performance meets the essential purpose of the contract. In the Manitowoc Case the contract called for a boiler having [571] a capacity of 150 per cent of the existing boiler. The court held there was no substantial performance because the boiler furnished had a capacity of only 82 per cent of the old boiler and only approximately one half of the boiler capacity contemplated by the contract. In Houlahan v. Clark (1901), 110 Wis. 43, 85 N. W. 676, the contract provided that the plaintiff was to drive pilings in the lake and place a boathouse thereon parallel and in line with a neighbor's dock. This was not done and the contractor so positioned the boathouse that it was practically useless to the owner. Manthey v. Stock (1907), 133 Wis. 107, 113 N. W. 443, involved a contract to paint a house and to do a good job, including the removal of the old paint where necessary. The plaintiff did not remove the old paint, and blistering and roughness of the new paint resulted. The court held that the plaintiff failed to show substantial performance. The defendants also cite Manning v. School Dist. (1905), 124 Wis. 84, 102 N. W. 356. However, this case involved a contract to install a heating and ventilating plant in the school building which would meet certain tests which the heating apparatus failed to do. The heating plant was practically a total failure to accomplish the purposes of the contract. See also Nees v. Weaver (1936), 222 Wis. 492, 269 N. W. 266 (roof on a garage).

Substantial performance as applied to construction of a house does not mean that every detail must be in strict compliance with the specifications and the plans. Something less than perfection is the test of specific performance unless all details are made the essence of the contract. This was not done here. There may be situations in which features or details of construction of special or of great personal importance, if not performed, would prevent a finding of substantial performance of the contract. In this case the plan was a stock floor plan. No detailed construction of the house was shown on the plan. There were no blueprints. [572] The specifications were standard printed forms with some modifications and additions written in by the parties. Many of the problems that arose during the construction had to be solved on the basis of practical experience. No mathematical rule relating to the percentage of the price, of cost of completion, or of completeness can be laid down to determine substantial performance of a building contract. Although the defendants received a house with which they are dissatisfied in many respects, the trial court was not in error in finding the contract was substantially performed.

The next question is, What is the amount of recovery when the plaintiff has substantially, but incompletely, performed? For substantial performance, the plaintiff should recover the contract price less the damages caused the defendant by the incomplete performance. Both parties agree Venzke v. Magdanz (1943), 243 Wis. 155, 9 N. W. (2d) 604, states the correct rule for damages due to faulty construction amounting to such incomplete performance, which is the difference between the value of the house as it stands with faulty and incomplete construction and the value of the house if it had been constructed in strict accordance with the plans and specifications. This is the diminished-value rule. The cost of replacement or repair is not the measure of such damage, but is an element to take into consideration in arriving at value under some circumstances. The cost of replacement or the cost to make whole the omissions may equal or be less than the difference in value in some cases and, likewise, the cost to rectify a defect may greatly exceed the added value to the structure as corrected. The defendants argue that under the Venzke rule their damages are $10,000. The plaintiff on review argues that the defendants' damages are only $650. Both parties agree the trial court applied the wrong rule to the facts.

The trial court applied the cost-of-repair or replacement rule as to several items, relying on Stern v. Schlafer (1943), [573] 244 Wis. 183, 11 N. W. (2d) 640, 12 N. W. (2d) 678, wherein it was stated that when there are a number of small items of defect or omission which can be remedied without the reconstruction of a substantial part of the building or a great sacrifice of work or material already wrought in the building, the reasonable cost of correcting the defect should be allowed. However, in Mohs v. Quarton (1950), 257 Wis. 544, 44 N. W. (2d) 580, the court held when the separation of defects would lead to confusion, the rule of diminished value could apply to all defects.

In this case no such confusion arises in separating the defects. The trial court disallowed certain claimed defects because they were not proven. This finding was not against the great weight and clear preponderance of the evidence and will not be disturbed on appeal. Of the remaining defects claimed by the defendants, the court allowed the cost of replacement or repair except as to the misplacement of the living-room wall. Whether a defect should fall under the cost-of-replacement rule or be considered under the diminished-value rule depends upon the nature and magnitude of the defect. This court has not allowed items of such magnitude under the cost-of-repair rule as the trial court did. Viewing the construction of the house as a whole and its cost we cannot say, however, that the trial court was in error in allowing the cost of repairing the plaster cracks in the ceilings, the cost of mud jacking, and repairing the patio floor, and the cost of reconstructing the nonweight-bearing and nonstructural patio wall. Such reconstruction did not involve an unreasonable economic waste.

The item of misplacing the living-room wall under the facts of this case was clearly under the diminished-value rule. There is no evidence that defendants requested or demanded the replacement of the wall in the place called for by the specifications during the course of construction. To tear down the wall now and rebuild it in its proper place [574] would involve a substantial destruction of the work, if not all of it, which was put into the wall and would cause additional damage to other parts of the house and require replastering and redecorating the walls and ceilings of at least two rooms. Such economic waste is unreasonable and unjustified. The rule of diminished value contemplates the wall is not going to be moved. Expert witnesses for both parties, testifying as to the value of the house, agreed that the misplacement of the wall had no effect on the market price. The trial court properly found that the defendants suffered no legal damage, although the defendants' particular desire for specified room size was not satisfied. For a discussion of these rules of damages for defective or unfinished construction and their application, see Restatement, 1 Contracts, pp. 572, 573, sec. 346 (1) (a), and illustrations.

On review, the plaintiff raises two questions: Whether he should have been allowed compensation for the disallowed extras, and whether the cost of reconstructing the patio wall was proper. The trial court was not in error in disallowing the claimed extras. None of them was agreed to in writing as provided by the contract, and the evidence is conflicting whether some were in fact extras or that the defendants waived the applicable requirements of the contract. The plaintiff had the burden of proof on these items. The second question raised by the plaintiff has already been disposed of in considering the cost-of-replacement rule.

It would unduly prolong this opinion to detail and discuss all the disputed items of defects of workmanship or omissions. We have reviewed the entire record and considered the points of law raised and believe the findings are supported by the great weight and clear preponderance of the evidence and the law properly applied to the facts.

By the Court.—Judgment affirmed.

[1] Motion for rehearing denied, with $25 costs, on October 4, 1960.

9.12 Jacob & Youngs, Inc. v. Kent, 230 N.Y. 239 (1921) 9.12 Jacob & Youngs, Inc. v. Kent, 230 N.Y. 239 (1921)

230 N.Y. 239
129 N.E. 889

JACOB & YOUNGS, Inc.,

v.

KENT.

Court of Appeals of New York.
Jan. 25, 1921.

Action by Jacob & Youngs, Incorporated, against George E. Kent. From an order of the Appellate Division (187 App. Div. 100,175 N. Y. Supp. 281), reversing judgment for defendant entered on verdict directed by the court and granting new trial, defendant appeals.

Order affirmed and judgment absolute directed in favor of plaintiff.

McLaughlin, Pound, and Andrews, JJ., dissenting. [890]
[230 N.Y. 239]Appeal from Supreme Court, Appellate Division, First department.
[230 N.Y. 240]Henry W. Hardon, of New York City, for appellant.

Frederick Hulse and Cornelius J. Sullivan, Jr., both of New York City, for respondent.

 

CARDOZO, J.

 

The plaintiff built a country residence for the defendant at a cost of upwards of $77,000, and now sues to recover a balance of $3,483.46, remaining unpaid. The work of construction ceased in June, 1914, and the defendant then began to occupy the dwelling. There was no complaint of defective performance until March, 1915. One of the specifications for the plumbing work provides that--

‘All wrought-iron pipe must be well galvanized, lap welded pipe of the grade known as ‘standard pipe’ of Reading manufacture.'

The defendant learned in March, 1915, that some of the pipe, instead of being made in Reading, was the product of other factories. The plaintiff was accordingly directed by the architect to do the work anew. The plumbing was then encased within the walls except in a few places where it had to be exposed. Obedience to the order meant more than the substitution of other pipe. It meant the demolition at great expense of substantial parts of [230 N.Y. 241]the completed structure. The plaintiff left the work untouched, and asked for a certificate that the final payment was due. Refusal of the certificate was followed by this suit.

The evidence sustains a finding that the omission of the prescribed brand of pipe was neither fraudulent nor willful. It was the result of the oversight and inattention of the plaintiff's subcontractor. Reading pipe is distinguished from Cohoes pipe and other brands only by the name of the manufacturer stamped upon it at intervals of between six and seven feet. Even the defendant's architect, though he inspected the pipe upon arrival, failed to notice the discrepancy. The plaintiff tried to show that the brands installed, though made by other manufacturers, were the same in quality, in appearance, in market value, and in cost as the brand stated in the contract-that they were, indeed, the same thing, though manufactured in another place. The evidence was excluded, and a verdict directed for the defendant. The Appellate Division reversed, and granted a new trial.

[1] We think the evidence, if admitted, would have supplied some basis for the inference that the defect was insignificant in its relation to the project. The courts never say that one who makes a contract fills the measure of his duty by less than full performance. They do say, however, that an omission, both trivial and innocent, will sometimes be atoned for by allowance of the resulting damage, and will not always be the breach of a condition to be followed by a forfeiture. Spence v. Ham, 163 N. Y. 220, 57 N. E. 412,51 L. R. A. 238; Woodward v. Fuller, 80 N. Y. 312; Glacius v. Black, 67 N. Y. 563, 566;Bowen v. Kimbell, 203 Mass. 364, 370, 89 N. E. 542,133 Am. St. Rep. 302. The distinction is akin to that between dependent and independent promises, or between promises and conditions. Anson on Contracts (Corbin's Ed.) § 367; 2 Williston on Contracts, § 842. Some promises are so plainly independent that they can never [230 N.Y. 242]by fair construction be conditions of one another. Rosenthal Paper Co. v. Nat. Folding Box & Paper Co., 226 N. Y. 313, 123 N. E. 766;Bogardus v. N. Y. Life Ins. Co., 101 N. Y. 328, 4 N. E. 522. Others are so plainly dependent that they must always be conditions. Others, though dependent and thus conditions when there is departure in point of substance, will be viewed as independent and collateral when the departure is insignificant. 2 Williston on Contracts, §§ 841, 842; Eastern Forge Co. v. Corbin, 182 Mass. 590, 592, 66 N. E. 419; Robinson v. Mollett, L. R., 7 Eng. & Ir. App. 802, 814; Miller v. Benjamin, 142 N. Y. 613, 37 N. E. 631. Considerations partly of justice and partly of presumable intention are to tell us whether this or that promise shall be placed in one class or in another. The simple and the uniform will call for different remedies from the multifarious and the intricate. The margin of departure within the range of normal expectation upon a sale of common chattels will vary from the margin to be expected upon a contract for the construction of a mansion or a ‘skyscraper.’ There will be harshness sometimes and oppression in the implication of a condition when the thing upon which labor has been expended is incapable of surrender because united to the land, and equity and reason in the implication of a like condition when the subject-matter, if defective, is in shape to be returned. From the conclusion that promises may not be treated as dependent to the extent of their uttermost minutiae without a sacrifice of justice, the progress is a short one to the conclusion that they may not be so treated without a perversion of intention. Intention not otherwise revealed may be presumed to hold in contemplation the reasonable and probable. If something else is in view, it must not be left to implication. There will be no assumption of a purpose to visit venial faults with oppressive retribution.

Those who think more of symmetry and logic in the development of legal rules than of practical adaptation to the attainment of a just result will be troubled by a classification[230 N.Y. 243]where the lines of division are so wavering and blurred. Something, doubtless, may be said on the score of consistency and certainty in favor of a stricter standard. The courts have balanced such considerations against those of equity and fairness, and found the latter to be the weightier. The decisions in this state commit us to the liberal view, which is making its way, nowadays, in jurisdictions slow to welcome it. Dakin & Co. v. Lee, 1916, 1 K. B. 566, 579. Where the line is to be drawn between the important and the trivial cannot be settled by a formula. ‘In the nature of the case precise boundaries are impossible.’ 2 Williston on Contracts, § 841. The same omission may take on one aspect or another according to its setting. Substitution of equivalents may not have the same significance in fields of art on the one side and in those of mere utility on the other. Nowhere will change be tolerated, however, if it is so dominant or pervasive as in any real or substantial measure to frustrate the purpose of the contract. Crouch v. Gutmann, 134 N. Y. 45, 51,31 N. E. 271,30 Am. St. Rep. 608. There is no general license to install whatever, in the builder's judgment, may be regarded as ‘just as good.’ Easthampton L. & C. Co., Ltd., v. Worthington, 186 N. Y. 407, 412,79 N. E. 323. The question is one of degree, to be answered, if there is doubt, by the triers of the facts (Crouch v. Gutmann; Woodward v. Fuller, supra), and, if the inferences are certain, by the judges of the law (Easthampton L. & C. Co., Ltd., v. Worthington, supra). We must weigh the purpose to be served, the desire to be gratified, the excuse for deviation from the letter, the cruelty of enforced adherence. Then only can we tell whether literal fulfillment is to be implied by law as a condition. This is not to say that the parties are not free by apt and certain words to effectuate a purpose that performance of every term shall be a condition of recovery. That question is not here. This is merely to say that the law will be slow to impute the purpose, in the silence of the parties, where the significance [230 N.Y. 244]of the default is grievously out of proportion to the oppression of the forfeiture. The willful transgressor must accept the penalty of his transgression. Schultze v. Goodstein, 180 N. Y. 248, 251,73 N. E. 21;Desmond-Dunne Co. v. Friedman-Doscher Co., 162 N. Y. 486, 490,56 N. E. 995. For him there is no occasion to mitigate the rigor of implied conditions. The transgressor whose default is unintentional and trivial may hope for mercy if he will offer atonement for his wrong. Spence v. Ham, supra.

[2] In the circumstances of this case, we think the measure of the allowance is not the cost of replacement, which would be great, but the difference in value, which would be either nominal or nothing. Some of the exposed sections might perhaps have been replaced at moderate expense. The defendant did not limit his demand to them, but treated the plumbing as a unit to be corrected from cellar to roof. In point of fact, the plaintiff never reached the stage at which evidence of the extent of the allowance became necessary. The trial court had excluded evidence that the defect was unsubstantial, and in view of that ruling there was no occasion for the plaintiff to go farther with an offer of proof. We think, however, that the offer, if it had been made, would not of necessity have been defective because directed to difference in value. It is true that in most cases the cost of replacement is the measure. Spence v. Ham, supra. The owner is entitled to the money which will permit him to complete, unless the cost of completion is grossly and unfairly out of proportion to the good to be attained. When that is true, the measure is the difference in value. Specifications call, let us say, for a foundation built of granite quarried in Vermont. On the completion of the building, the owner learns that through the blunder of a subcontractor part of the foundation has been built of granite of the same quality quarried in New Hampshire. The measure of allowance is not the cost of reconstruction. ‘There may be [230 N.Y. 245]omissions of that which could not afterwards be supplied exactly as called for by the contract without taking down the building to its foundations, and at the same time the omission may not affect the value of the building for use or otherwise, except so slightly as to be hardly appreciable.’ Handy v. Bliss, 204 Mass. 513, 519, 90 N. E. 864,134 Am. St. Rep. 673. Cf. Foeller v. Heintz, 137 Wis. 169, 178, 118 N. W. 543,24 L. R. A. (N. S.) 321; [892] Oberlies v. Bullinger, 132 N. Y. 598, 601,30 N. E. 999; 2 Williston on Contracts, § 805, p. 1541. The rule that gives a remedy in cases of substantial performance with compensation for defects of trivial or inappreciable importance has been developed by the courts as an instrument of justice. The measure of the allowance must be shaped to the same end.

The order should be affirmed, and judgment absolute directed in favor of the plaintiff upon the stipulation, with costs in all courts.

McLAUGHLIN, J.

 

I dissent. The plaintiff did not perform its contract. Its failure to do so was either intentional or due to gross neglect which, under the uncontradicted facts, amounted to the same thing, nor did it make any proof of the cost of compliance, where compliance was possible.

Under its contract it obligated itself to use in the plumbing only pipe (between 2,000 and 2,500 feet) made by the Reading Manufacturing Company. The first pipe delivered was about 1,000 feet and the plaintiff's superintendent then called the attention of the foreman of the subcontractor, who was doing the plumbing, to the fact that the specifications annexed to the contract required all pipe used in the plumbing to be of the Reading Manufacturing Company. They then examined it for the purpose of ascertaining whether this delivery was of that manufacture and found it was. Thereafter, as pipe was required in the progress of the work, the foreman of the subcontractor would leave word at its [230 N.Y. 246]shop that he wanted a specified number of feet of pipe, without in any way indicating of what manufacture. Pipe would thereafter be delivered and installed in the building, without any examination whatever. Indeed, no examination, so far as appears, was made by the plaintiff, the subcontractor, defendant's architect, or any one else, of any of the pipe except the first delivery, until after the building had been completed. Plaintiff's architect then refused to give the certificate of completion, upon which the final payment depended, because all of the pipe used in the plumbing was not of the kind called for by the contract. After such refusal, the subcontractor removed the covering or insulation from about 900 feet of pipe which was exposed in the basement, cellar, and attic, and all but 70 feet was found to have been manufactured, not by the Reading Company, but by other manufacturers, some by the Cohoes Rolling Mill Company, some by the National Steel Works, some by the South Chester Tubing Company, and some which bore no manufacturer's mark at all. The balance of the pipe had been so installed in the building that an inspection of it could not be had without demolishing, in part at least, the building itself.

I am of the opinion the trial court was right in directing a verdict for the defendant. The plaintiff agreed that all the pipe used should be of the Reading Manufacturing Company. Only about two-fifths of it, so far as appears, was of that kind. If more were used, then the burden of proving that fact was upon the plaintiff, which it could easily have done, since it knew where the pipe was obtained. The question of substantial performance of a contract of the character of the one under consideration depends in no small degree upon the good faith of the contractor. If the plaintiff had intended to, and had, complied with the terms of the contract except as to minor omissions, due to inadvertence, then he might be allowed to recover the contract price, less the amount [230 N.Y. 247]necessary to fully compensate the defendant for damages caused by such omissions. Woodward v. Fuller, 80 N. Y. 312; Nolan v. Whitney, 88 N. Y. 648. But that is not this case. It installed between 2,000 and 2,500 feet of pipe, of which only 1,000 feet at most complied with the contract. No explanation was given why pipe called for by the contract was not used, nor that any effort made to show what it would cost to remove the pipe of other manufacturers and install that of the Reading Manufacturing Company. The defendant had a right to contract for what he wanted. He had a right before making payment to get what the contract called for. It is no answer to this suggestion to say that the pipe put in was just as good as that made by the Reading Manufacturing Company, or that the difference in value between such pipe and the pipe made by the Reading Manufacturing Company would be either ‘nominal or nothing.’ Defendant contracted for pipe made by the Reading Manufacturing Company. What his reason was for requiring this kind of pipe is of no importance. He wanted that and was entitled to it. It may have been a mere whim on his part, but even so, he had a right to this kind of pipe, regardless of whether some other kind, according to the opinion of the contractor or experts, would have been ‘just as good, better, or done just as well.’ He agreed to pay only upon condition that the pipe installed were made by that company and he ought not to be compelled to pay unless that condition be performed. Schultze v. Goodstein, 180 N. Y. 248, 73 N. E. 21; Spence v. Ham, supra; Steel S. & E. C. Co. v. Stock, 225 N. Y. 173, 121 N. E. 786;Van Clief v. Van Vechten, 130 N. Y. 571, 29 N. E. 1017;Glacius v. Black, 50 N. Y. 145, 10 Am. Rep. 449;Smith v. Brady, 17 N. Y. 173, and authorities cited on [893] page 185, 72 Am. Dec. 442. The rule, therefore, of substantial performance, with damages for unsubstantial omissions, has no application. Crouch v. Gutmann, 134 N. Y. 45, 31 N. E. 271,30 Am. St. Rep. 608;Spence v. Ham, 163 N. Y. 220, 57 N. E. 412,51 L. R. A. 238.

[230 N.Y. 248]What was said by this court in Smith v. Brady, supra, is quite applicable here:

‘I suppose it will be conceded that every one has a right to build his house, his cottage or his store after such a model and in such style as shall best accord with his notions of utility or be most agreeable to his fancy. The specifications of the contract become the law between the parties until voluntarily changed. If the owner prefers a plain and simple Doric column, and has so provided in the agreement, the contractor has no right to put in its place the more costly and elegant Corinthian. If the owner, having regard to strength and durability, has contracted for walls of specified materials to be laid in a particular manner, or for a given number of joists and beams, the builder has no right to substitute his own judgment or that of others. Having departed from the agreement, if performance has not been waived by the other party, the law will not allow him to allege that he has made as good a building as the one he engaged to erect. He can demand payment only upon and according to the terms of his contract, and if the conditions on which payment is due have not been performed, then the right to demand it does not exist. To hold a different doctrine would be simply to make another contract, and would be giving to parties an encouragement to violate their engagements, which the just policy of the law does not permit.’ (17 N. Y. 186, 72 Am. Dec. 422).

I am of the opinion the trial court did not err in ruling on the admission of evidence or in directing a verdict for the defendant.

For the foregoing reasons I think the judgment of the Appellate Division should be reversed and the judgment of the Trial Term affirmed.

HISCOCK, C. J., and HOGAN and CRANE, JJ., concur with CARDOZO, J.

 

POUND and ANDREWS, JJ., concur with McLAUGHLIN, J.


 

Order affirmed, etc.

9.13 UCC Sections on Substantial Performance and Imperfect Tender 9.13 UCC Sections on Substantial Performance and Imperfect Tender

UCC Sections on Substantial Performance and Imperfect Tender

  • 2-601. Buyer's Rights on Improper Delivery.

Subject to the provisions of this Article on breach in installment contracts (Section 2-612) and unless otherwise agreed under the sections on contractual limitations of remedy (Sections 2-718 and 2-719), if the goods or the tender of delivery fail in any respect to conform to the contract, the buyer may

(a) reject the whole; or

(b) accept the whole; or

(c) accept any commercial unit or units and reject the rest.

  • 2-607. Effect of Acceptance; Notice of Breach; Burden of Establishing Breach After Acceptance; Notice of Claim or Litigation to Person Answerable Over.

(1) The buyer must pay at the contract rate for any goods accepted.

(2) Acceptance of goods by the buyer precludes rejection of the goods accepted and if made with knowledge of a non-conformity cannot be revoked because of it unless the acceptance was on the reasonable assumption that the non-conformity would be seasonably cured but acceptance does not of itself impair any other remedy provided by this Article for non-conformity.

(3) Where a tender has been accepted

(a) the buyer must within a reasonable time after he discovers or should have discovered any breach notify the seller of breach or be barred from any remedy; and

(b) if the claim is one for infringement or the like (subsection (3) of Section 2-312) and the buyer is sued as a result of such a breach he must so notify the seller within a reasonable time after he receives notice of the litigation or be barred from any remedy over for liability established by the litigation.

(4) The burden is on the buyer to establish any breach with respect to the goods accepted.

(5) Where the buyer is sued for breach of a warranty or other obligation for which his seller is answerable over

(a) he may give his seller written notice of the litigation. If the notice states that the seller may come in and defend and that if the seller does not do so he will be bound in any action against him by his buyer by any determination of fact common to the two litigations, then unless the seller after seasonable receipt of the notice does come in and defend he is so bound.

(b) if the claim is one for infringement or the like (subsection (3) of Section 2-312) the original seller may demand in writing that his buyer turn over to him control of the litigation including settlement or else be barred from any remedy over and if he also agrees to bear all expense and to satisfy any adverse judgment, then unless the buyer after seasonable receipt of the demand does turn over control the buyer is so barred.

(6) The provisions of subsections (3), (4) and (5) apply to any obligation of a buyer to hold the seller harmlesss against infringement or the like (subsection (3) of Section 2-312).